1,000+ Opportunities
Find the right grant
Search federal, foundation, and corporate grants with AI — or browse by agency, topic, and state.
Severe erosion along the shoreline of Cedar Point at NAS Patuxent River has resulted in a loss of approximately 275 feet of shoreline since 1985. Stabilization efforts to the south of Cedar Point have halted erosion in that direction but have resulted in accelerated deterioration of the adjoining shoreline and point to the north. The original 2015 stabilization project was divided into three phases. Phase 1 would utilize 1,335 LF of breakwaters to stabilize the point of CedarPoint as well as 2,358 LF of revetment and sills extending southwestward along the eastern shoreline, up to the mouth of Goose Creek. Phase 2 consisted of approximately 5,173 LF of revetment that continued the eastern shoreline stabilization downwards from Goose Creek. The final section of stabilization, Phase 3, would continue the Phase 2 revetment for an additional 2,809 LF, ending at the Chesapeake Basin. Phase 2 has already been constructed. Since thepurpose of this cooperative agreement is to provide for the implementation of the original design, the current stabilization measures have experienced elevation changes as well as underwater topography and stability. The is to conduct surveys and bathymetry studies, re-evaluate existing site conditions for Phases 1 and 3,4 redesign the existing plans in order to account for environmental changes over the past 5 years, and to ensure successful future implementation of the remaining phases.
Funding Opportunity Number: N400802020004. Assistance Listing: 12.300. Funding Instrument: CA. Category: NR. Award Amount: Up to $109K per award.
Get alerted about grants like this
Get emailed when new opportunities from “NAVFAC Washington DC” or related funders appear. Free, weekly, unsubscribe anytime.
Or search similar grants →According to the current listing, eligibility includes: Eligible applicants: Unrestricted (i.e., open to any type of entity above), subject to any clarification in text field entitled Additional Information on Eligibility. Confirm the full requirements in the official notice before applying.
The current listing shows up to $109K per award. Verify award ceilings, matching requirements, and allowable costs in the official notice.
The published deadline was September 2, 2020, which has passed. Check the official notice for any future application windows before investing time in a proposal.
Yes — FY20 NAS Pax River Shoreline Bathmetry & Redesign is offered by NAVFAC Washington DC and this listing comes from Grants.gov, an official U.S. federal source. Federal applications generally require registrations (for example SAM.gov or an agency submission portal), so allow extra lead time.
Start from the official opportunity page linked in this listing — it carries the sponsor's submission instructions.
Past winners and funding trends for this program
The Trump administration is renegotiating $33 billion in CHIPS Act grants, demanding equity stakes in Intel, Samsung, and TSMC. With only 24 of 161 milestones completed and applications still open, here is what the new terms mean for semiconductor manufacturers and supply chain companies.
Read articleThe 2026 UMR economic impact report shows NIH funding produced $94 billion in activity and nearly 400,000 jobs — while success rates hit a 30-year low. The strongest economic argument against cutting biomedical research funding, and what researchers should do now.
Read articleNIST launched a sweeping initiative to standardize how AI agents authenticate, interoperate, and stay secure. Companies building autonomous AI systems need to pay attention now.
Read article