Wisconsin's $125 million PFAS Trust Fund was approved in the 2023-25 state budget. It then sat unspent for more than two years while the Legislature and Gov. Tony Evers fought over who controlled it. On October 20, 2026, Evers and the Department of Natural Resources (DNR) announced the first grant programs paid for by that fund. Applications for the first one, the PFAS Community Grants Sampling Program, opened on October 19.

The first round, called Cycle A, is small. It offers $2 million in three categories, against a $79 million statutory allocation for community grants. Grants are not scored against each other. DNR executes grant agreements in the order complete applications are received, until the money runs out or the cycle closes on April 30, 2027. A municipality with a well-defined sampling area should file a complete application early, because a strong proposal submitted in March may find nothing left.

What Cycle A funds

The Cycle A guidance divides the $2 million into three pools:

PoolCycle A fundingStatutory basis
Sampling private wells, plus eligible schools and child care facilities$1,000,000s. 292.74(2)(a), (2)(d)
Sampling wastewater, biosolids, sludge, influent, effluent, septage and industrial waste at treatment plants$500,000s. 292.74(2)(f)
Temporary bottled water, treatment or other response actions for wells above health advisory levels$500,000s. 292.74(2)(j)

DNR estimates that Cycle A will pay for sampling at more than 1,200 homes, child care facilities and schools. The guidance sets no maximum award and no maximum per-sample cost. Costs only have to be "reasonable" and based on current lab rates. DNR recommends at least 25 private residences, or at least one school or child care facility, per application. Eligible applicants may submit more than one application per cycle and may apply in multiple cycles.

DNR says Cycle B will open "as soon as possible" after Cycle A closes, with more money and a wider list of eligible projects. The statute already authorizes sampling of high-capacity irrigation wells and agricultural soil (s. 292.74(2)(e)) and of landfill leachate, groundwater and nearby private wells at municipal landfills (s. 292.74(2)(g)). The governor's office expects programs for irrigation wells, farm fields, landfill leachate and public airports in 2027.

Where the money comes from, and why it took so long

The Trust Fund was created in the 2023-25 budget. Republican legislators on the Joint Committee on Finance kept DNR from spending it for more than two years and removed Evers' PFAS proposals from the 2025-27 budget. The deadlock ended with 2025 Wisconsin Acts 200 and 201, written by Sen. Eric Wimberger (R-Gillett) and signed on April 6, 2026. The acts direct the money as follows:

The fund earned interest while frozen. Wisconsin Public Radio reports it had grown to about $134 million by the end of June 2026. The state also received a roughly $10 million payment in June 2026 from its settlement in State v. Tyco Fire Products LP over firefighting-foam contamination in Marinette and Peshtigo. That money is being used separately for residents there.

The standards have moved as well. In March 2026, Evers approved lowering the state's drinking-water threshold for PFOA and PFOS from 70 parts per trillion to an enforceable 4.0 ppt, matching the federal maximum contaminant levels. The Natural Resources Board is scheduled to vote on proposed PFAS groundwater standards next week. Groundwater standards are what private-well results will eventually be judged against. For now, the grant program uses the Department of Health Services' drinking water health advisory levels for 17 PFAS compounds. The strictest are 4 ng/L for PFOA, PFOS, FOSA, NEtFOSA, NEtFOSAA and NEtFOSE, and 10 ng/L for PFNA, PFHxS and GenX.

Who can apply, and who cannot

Only "municipalities" as defined in s. 292.74(1)(c) may apply: cities, villages, towns, counties, tribal governing bodies, utility districts, lake protection districts, sewerage districts and technical college districts. Private well owners, homeowners' associations, nonprofits and private schools cannot apply on their own. They need a municipal sponsor. If no municipality is running a program in their area, households can request a free WisPPWT kit instead.

Lake protection districts and sanitary or utility districts in unsewered lake country are on the list. These small special-purpose governments often know exactly which shoreline homes are on shallow private wells. For a district already doing lake sampling, a private-well application can be a natural next project.

There are several eligibility traps:

The 20% match is easier than it looks

Section 292.74(6) requires a match of at least 20% of the DNR award, not 20% of the total project. DNR gives two ways to calculate it. If the total project costs $12,000, the maximum grant is $12,000 ÷ 1.20 = $10,000 and the match is $2,000. If you request $64,500, the match is $12,900 and the total project is $77,400.

The match does not have to be cash. Eligible match includes in-kind contributions, municipal staff time (force account), volunteer labor, donated equipment and outside cash donations. Administrative costs, such as project planning, owner outreach, results letters and sourcing bottled water, can either count toward the match or be reimbursed as grant expenses. For most towns, the clerk's and public works staff's hours spent recruiting households and distributing kits will cover a large share of the match. Track those hours from the start using DNR's force account form (8700-352) and donated volunteer labor form (8700-349).

Two features that set this program apart

1. You must plan for what happens after you test. A well-sampling applicant must submit a Post-Sampling Action Plan describing how it will respond when a well exceeds a health advisory level. The plan must be ready to run for at least six months. Acceptable responses are bottled water that has been purified or filtered, a treatment system certified to ANSI/NSF Standard 53 or 58 for PFAS reduction, or another tested source below DHS advisories. DNR may extend funding past six months. Owners are not required to accept the offer. DNR recommends putting the response options directly in the results letter so exposure can stop immediately.

The design reflects what happened in French Island, the former Town of Campbell, near the La Crosse Regional Airport. More than 500 private wells were sampled there, and nearly a third showed levels of concern to state health officials. A municipality that samples 100 homes in a known contamination area should plan for dozens of households needing water for months. At that point the $500,000 response pool, shared statewide, may run out before the $1 million sampling pool does. Budget the response phase as carefully as the sampling phase, and ask for it in the same application.

2. Wastewater sampling also helps with permits. In the $500,000 wastewater and biosolids pool, sampling required by a facility's WPDES permit is eligible. A treatment plant can therefore use the grant for PFAS monitoring it already has to do, plus collection-system sampling at interceptors to trace PFAS back to industrial sources. Labs must use EPA Method 1633A, and results go into DNR Switchboard. For a plant that land-applies biosolids and faces rising pressure from PFAS limits on land application, this is low-cost source-reduction work. Larger sewerage districts should treat it as a priority.

The fine print on reimbursement

The program pays only after you spend:

Small towns without cash reserves need to plan for the gap between paying the lab and getting reimbursed. A short-term borrowing resolution or a county partnership may be needed.

Strategy: how to get funded in Cycle A

File early with a complete application. The program funds complete applications in the order received, and DNR takes up to four weeks just to determine whether an application is complete. An application with a missing resolution goes back to the end of the line once it is fixed. Before submitting, gather the Grant Project Resolution (Form 8700-388), the correct application form (8700-400DG for drinking water, 8700-400WY for wastewater), the supplemental Excel workbook, and the municipal notification template in Appendix B if you plan to sample inside another jurisdiction.

Pass the needed resolution at your next regular meeting. Most towns and village boards meet monthly. The 8700-388 resolution and any match appropriation should be adopted in November or December, not in March.

Define the sampling area. Applications built around a documented reason for concern are easier to run and to defend. Examples include proximity to an airport, fire training site, landfill, paper mill or biosolids land-application field, or a cluster of wells with early detections. For counties, one countywide application with neighborhood phases can reach the 25-home minimum in several places at once.

Consider splitting the application. Because applicants can file more than once per cycle, a county could file a ready-to-go private-well application now and a wastewater or school application later, rather than waiting until every part is ready.

Line up the follow-on funding now. Sampling is the first step in a longer process. Homes with exceedances will become candidates for the expanded $35 million Well Compensation Grant Program. If sampling shows contamination is widespread, a community may make the case for extending public water to the affected area, which falls under DNR's existing infrastructure programs. Sampling data collected under the QAPP is documented evidence you can reuse in later cycles and in other applications. On the federal side, EPA's Emerging Contaminants in Small or Disadvantaged Communities grants and the Drinking Water State Revolving Fund's emerging-contaminant money cover public systems. For comparison, New York's state grants for PFAS treatment pay up to 70% of eligible costs, as covered in our analysis of the 2026 WIIA round.

Expect demand to exceed the money. Cycle A's $2 million is about 2.5% of the $79 million allocation. That makes it a pilot that lets DNR see how quickly municipalities apply before it opens larger cycles. If the money is gone before April, apply anyway or be ready for Cycle B with an application that already passed DNR's completeness review. Being in DNR's system with a reviewed application is the strongest starting position for Cycle B.

DNR has said application webinars for the drinking water and wastewater tracks are "coming soon." Questions go to DNRPFASGrants@wisconsin.gov. For a first-come program, ask your questions before you file.

If your town, county, tribe or sewerage district is preparing a PFAS Sampling Program application, including the sampling plan, post-sampling action plan and match budget, Granted can help you draft it and check it against DNR's Cycle A guidance.

Get AI Grants Delivered Weekly

New funding opportunities, deadline alerts, and grant writing tips every Tuesday.

More Tips Articles

New York's 2026 Water Grants: Nearly $500M to 106 Projects as the $3.75B Clean Water Plan Starts and Federal IIJA Money Ends. What Municipalities Should Do Before the Next WIIA Round

Gov. Hochul announced nearly $500M in Water Infrastructure Improvement (WIIA) and Intermunicipal (IMG) grants on October 20, 2026, for 106 projects with $1.4B in total costs. It is the first installment of a $3.75B Clean Water Investment Plan. The round offered $425M and paid 25% up to $25M for sewer projects, 70% with no cap for PFAS above the federal MCL, and 40% up to $30M for intermunicipal projects. Here is where the money went, how the formulas work, and how to be ready for 2027 as IIJA supplemental funding ends.

Read article

NIJ Is Paying $23.8M to Find Out Whether Red Flag Laws and Crisis Courts Work. The Real Constraint Is the Program's September 2029 Sunset

NIJ's FY 2026 Evaluation of the Byrne State Crisis Intervention Program (O-NIJ-2026-172798) offers $23,773,974 across four cooperative agreements of up to $5,943,493 each, one per program area: law enforcement crisis intervention, court-based programming, treatment referrals and extreme risk protection orders. Grants.gov is due November 16, 2026 and JustGrants November 23. Every application needs a 15-month evaluability assessment of up to eight sites plus a 33-month impact evaluation, and the programs being evaluated may stop operating by September 30, 2029. Here is how the design works and how to write a competitive application.

Read article

OJJDP's FY 2026 Opioid Affected Youth Initiative: $8.92M, 12 Awards of Up to $750,000, a November 16 Deadline and a New Priority List Built Around Street Disorder

OJJDP's FY 2026 Opioid Affected Youth Initiative (O-OJJDP-2026-172748) offers $8,920,000 for 12 three-year grants of up to $750,000, starting January 1, 2027. Grants.gov is due November 16, 2026 and JustGrants November 23. There is no match, there is no narrative (just a scored questionnaire of one to two paragraphs per question), and capability counts for 30% of the score. A second priority tier rewards jurisdictions that enforce bans on open drug use, urban camping and squatting and that use civil commitment. Here is what changed, who can apply, and how to compete.

Read article

Not sure which grants to apply for?

Use our free grant finder to search active federal funding opportunities by agency, eligibility, and deadline.

Find Grants

Ready to write your next grant?

Draft your proposal with Granted AI. Professional members win a grant in 12 months or get a full refund.

Backed by the Granted Guarantee