1,000+ Opportunities
Find the right grant
Search federal, foundation, and corporate grants with AI — or browse by agency, topic, and state.
Background:The United States Army Corps of Engineers operates and maintains more than 80 flood risk management (FRM) reservoirs within the Ohio River Basin. While the primary purpose of these projects is to prevent flood damages, in the course of normal operation these projects make regular releases that augment the flow of downstream rivers and provide ancillary benefits to adjacent communities and transient users. Because of this augmentation, at certain times the flows on the Ohio River are actually higher than would have occurred naturally. These higher flows possibly provide benefits in the form of reduced treatment costs for dischargers, more hours of hydropower generation, fewer navigation delays, a more reliable water supply and other benefits that are not currently understood or captured.This effort seeks to identify and, when practicable, monetize ancillary benefits resulting from augmented flows associated with releases from multi-purpose reservoir projects. Its focus will be on the impacts and benefits associated with projects operating within the borders of the Ohio River Basin on flows and benefits located along the mainstem of the Ohio River. However, the methodologies identified should be generally applicable to augmented flows from reservoirs across the United States.At a minimum, benefits to municipal wastewater treatment plants and to water supply will be examined. Additional consideration of benefits to other industrial dischargers, navigation, hydropower and recreation are a plus, as is some discussion and consideration of the overall impacts of climate change on the benefit potential in the future. Brief description of Anticipated Work:The proposed project will describe how much of an influence the reservoir releases are having on the flows in the mainstem Ohio River and whether those increased flows are providing an economic benefit. This effort will involve the gathering of existing flow information, data reconciliation (developing processes for the filling of data gaps) and comparing observed flows and natural flows for each Ohio River mainstem lock and dam over the period of 1990 to present. This comparison will include a reporting of commonly used flow statistics which will serve as the basis for the economic analysis. The economic analysis will determine whether or not the difference between observed and natural flows is significant enough to result in positive benefits to wastewater treatment plants, water supplies and other river users. The overall effort should result in the development of repeatable analytical processes that can be applied to other reservoir influenced riverine systems across the United States. The results of the study will be presented in the form of a final report and the development of manuscripts for peer review should also be considered as appropriate.
Funding Opportunity Number: W81EWF-22-SOI-0022. Assistance Listing: 12.630. Funding Instrument: CA. Category: ST. Award Amount: Up to $45K per award.
Get alerted about grants like this
Get emailed when new opportunities from “Dept. of the Army -- Corps of Engineers” or related funders appear. Free, weekly, unsubscribe anytime.
Or search similar grants →According to the current listing, eligibility includes: Eligible applicants: Others (see text field entitled Additional Information on Eligibility for clarification). This opportunity is restricted to non-federal partners of the Colorado Plateau and Great Rivers Cooperative Ecosystems Studies Units (CESU). Confirm the full requirements in the official notice before applying.
The current listing shows up to $45K per award. Verify award ceilings, matching requirements, and allowable costs in the official notice.
The published deadline was August 1, 2022, which has passed. Check the official notice for any future application windows before investing time in a proposal.
Yes — “Evaluating the Economic Implications of Low Flow Augmentation on the Ohio River" is offered by Dept. of the Army -- Corps of Engineers and this listing comes from Grants.gov, an official U.S. federal source. Federal applications generally require registrations (for example SAM.gov or an agency submission portal), so allow extra lead time.
This opportunity targets applicants in Colorado. If your organization operates elsewhere, check the official notice for location requirements.
Start from the official opportunity page linked in this listing — it carries the sponsor's submission instructions.
Past winners and funding trends for this program
After SBIR reauthorization, the U.S. Army released five new small-business topics under Army FUZE — Ka-Band metamaterial radar, a Li-ion 6T battery open topic, in-transit-visibility blockchain, modular UAS payloads, and the xTech|Phantum prize competition. Awards run from $150K to $300K per Phase I. But the bigger story is the Army's shift from funding parts to funding whole systems. Here is what each topic funds and how to compete.
Read articleDARPA transferred its first autonomous-ready H-60Mx Black Hawk to the Army on March 20, capping a decade of ALIAS research. Now the same technology underpins an SBIR XL opportunity for small businesses building wildfire autonomy.
Read articleThe GitLab Foundation AI for Economic Opportunity Fund just selected 16 organizations from 800 applicants. With $250K grants, OpenAI engineering support, and projected $1.43B in lifetime earnings impact, this is what serious AI philanthropy looks like.
Read article