1,000+ Opportunities
Find the right grant
Search federal, foundation, and corporate grants with AI — or browse by agency, topic, and state.
The government seeks research and technical support for watershed management modeling and analyses for water quantity and quality, impacts to aquatic species, and effects of extreme rainfall events to take place at the Fort Leonard Wood, MO area. Details of primary tasks are as follows: Task 1: Watershed modeling SWAT+ modeling will be completed for the Big Piney River (a HUC 12 watershed) and Roubidoux Creek (part of the Upper Gasconade HUC 12 watershed). The area around FLW is a karst landscape. Models will be calibrated using USGS stream gages and TSS sampling data supplied by FLW and ERDC-CERL. Task 1 consists of 2 (two) subtasks. a) Model(s) will incorporate existing climate and watershed/management conditions, b) model(s) will incorporate the recommended areal coverage of BMP types and management practices into the SWAT+ models to estimate change to water quality and discharge under existing climate conditions, Note: ERDC-CERL will assist with creating recommended BMPs and management practices. Task 2: Assess model output and determine management prioritization Interpretation and evaluation of model results to prioritize watersheds to target with proposed BMPs and management. Analyses will include statistical methods to justify periodization. The cost of BMP implementation and ongoing operations and management cost and the potential water quality and quantity impacts will also be included. Standard maintenance plans for all recommended BMPs will be required. Task 3: Develop a Watershed Management Plan Develop a Watershed Management Plan with recommended preliminary designs and locations for future development of LID features and BMPs to protect imperiled aquatic species, reduce infrastructure maintenance costs, and support current and future land usages. The final Watershed Management Plan will be included in the FLW Integrated Natural Resources Management Plan (INRMP) and used by land management groups on FLW including the Directorate of Public Works (DPW), Training, Mobilization & Security (DPTMS), and Integrated Training Area Management (ITAM) as well as the adjacent Mark Twain State Forest.
Funding Opportunity Number: W81EWF-24-SOI-0031. Assistance Listing: 12.630. Funding Instrument: CA. Category: ST. Award Amount: Up to $230K per award.
Get alerted about grants like this
Get emailed when new opportunities from “Dept. of the Army -- Corps of Engineers” or related funders appear. Free, weekly, unsubscribe anytime.
Or search similar grants →According to the current listing, eligibility includes: Eligible applicants: Others (see text field entitled Additional Information on Eligibility for clarification). This opportunity is restricted to non-federal partners of the Great Rivers Cooperative Ecosystems Studies Unit (CESU). Confirm the full requirements in the official notice before applying.
The current listing shows up to $230K per award. Verify award ceilings, matching requirements, and allowable costs in the official notice.
The published deadline was August 12, 2024, which has passed. Check the official notice for any future application windows before investing time in a proposal.
Yes — “Technical Support for Watershed Management and Resilience Plan for Fort Leonard Wood, MO” is offered by Dept. of the Army -- Corps of Engineers and this listing comes from Grants.gov, an official U.S. federal source. Federal applications generally require registrations (for example SAM.gov or an agency submission portal), so allow extra lead time.
Start from the official opportunity page linked in this listing — it carries the sponsor's submission instructions.
Past winners and funding trends for this program
After SBIR reauthorization, the U.S. Army released five new small-business topics under Army FUZE — Ka-Band metamaterial radar, a Li-ion 6T battery open topic, in-transit-visibility blockchain, modular UAS payloads, and the xTech|Phantum prize competition. Awards run from $150K to $300K per Phase I. But the bigger story is the Army's shift from funding parts to funding whole systems. Here is what each topic funds and how to compete.
Read articleDARPA transferred its first autonomous-ready H-60Mx Black Hawk to the Army on March 20, capping a decade of ALIAS research. Now the same technology underpins an SBIR XL opportunity for small businesses building wildfire autonomy.
Read articleThe GitLab Foundation AI for Economic Opportunity Fund just selected 16 organizations from 800 applicants. With $250K grants, OpenAI engineering support, and projected $1.43B in lifetime earnings impact, this is what serious AI philanthropy looks like.
Read article