1,000+ Opportunities
Find the right grant
Search federal, foundation, and corporate grants with AI — or browse by agency, topic, and state.
ATLANTIS (Aerodynamic Turbines, Lighter and Afloat, with Nautical Technologies and Integrated Servo-control) Program Phase Two is sponsored by U.S. Department of Energy (DOE) ARPA-E. This program focuses on novel forms of systems engineering of floating offshore wind systems to drive down costs.
Phase two specifically focuses on experimental testing in ocean, lake, and tank and tunnel environments to further develop new technology for floating offshore wind turbines.
Get a weekly digest of new grants like this
A free weekly digest of new foundation and federal funding opportunities as they're added to Granted. Unsubscribe anytime.
Or search similar grants →According to the current listing, eligibility includes: Not explicitly stated for small businesses in the search result, but ARPA-E programs generally encourage collaboration across various entities. Confirm the full requirements in the official notice before applying.
ATLANTIS (Aerodynamic Turbines, Lighter and Afloat, with Nautical Technologies and Integrated Servo-control) Program Phase Two is funded by U.S. Department of Energy (DOE) ARPA-E. Verify program details on the funder's official page before applying.
Start from the official opportunity page linked in this listing — it carries the sponsor's submission instructions.
Past winners and funding trends for this program
On September 21, 2026 DOE selected 21 projects under DE-FOA-0003472 — five EGS field tests and 16 exploration wells — for up to $99 million of a $171.5 million authorization. The solicitation is structured to reopen for up to 72 months on roughly annual cycles. Here is how to position for the next one.
Read articleDOE named 31 grid projects across 26 states for $1.9B on September 24, 2026. Recipients bring $3.35B of their own money. Here is what the selection list reveals about how to win the next GRIP round.
Read articleARPA-H launched SPECTRA on September 17, 2026 under solicitation ARPA-H-SOL-26-163 — four technical areas with separate Solution Summary deadlines on October 18, December 2, and January 18. The enabling-technologies area closes first, five weeks after launch. Here is why the sequencing matters and how to read each TA.
Read article