1,000+ Opportunities
Find the right grant
Search federal, foundation, and corporate grants with AI — or browse by agency, topic, and state.
This listing may be outdated. Verify details at the official source before applying.
Find similar grantsThis program provides grants to ensure the United States has viable domestic manufacturing and recycling capabilities to support a North American battery supply chain.
Get a weekly digest of new grants like this
A free weekly digest of new foundation and federal funding opportunities as they're added to Granted. Unsubscribe anytime.
Or search similar grants →According to the current listing, eligibility includes: Institutions of higher education, national laboratories, nonprofit and for-profit private entities, state and local governments, and consortia of these entities. Confirm the full requirements in the official notice before applying.
The current listing shows up to $3 Billion total program funding; individual awards vary (e.g., $50 million-$100 million). Verify award ceilings, matching requirements, and allowable costs in the official notice.
Battery Manufacturing and Recycling Grants Program is funded by U.S. Department of Energy (DOE) (state and local governments are eligible recipients). Verify program details on the funder's official page before applying.
Past winners and funding trends for this program
Integrated Production and Product Development for Next-Generation Lithium-based Batteries for Mobility (BATT4EU and Made in Europe Partnerships) is sponsored by European Commission — Horizon Europe. Expected Outcome: Proposals are expected to contribute to all following points: The projects must fulfil the performance targets, at the cell and system level, corresponding to the specific targeted application, to be specified in the proposal. Appropriate KPI must be defined for the energy density (volumetric and gravimetric), Power density and C-rate, number of cycles and cost defined under operational conditions. Boost EU competitiveness in next-generation battery technologies for mobility applications. Develop pilot manufacturing capability for next generation lithium-based batteries. Strengthen the EU battery value chain, including new manufacturing equipment, automation, and scalable production processes. Advance the understanding of next-generation battery interfaces at an industrial scale, ensuring manufacturability, durability, and cost-effectiveness. In the case of aviation, the battery requirements should be compatible at minimum with EASA CS.23 (level 4), CS.27 and preferably with CS.25 categories. Scope: This topic will support the scaling-up of next generation (i.e., beyond generation 3) lithium-based batteries (e.g., semi and all-solid state, generation5) from cell prototypes (TRL 4-5) to demonstration of scalable production and demonstration of cell integration into module/pack level. The projects will cover pilot production, process automation, system integration and demonstration, advanced cell design, and supply chain development to ensure that Europe remains at the forefront of battery innovation. The projects must address the needs of a single specific and strategically relevant transport mode, and the targeted mode must be clearly indicated in the proposal. The following transport modes are in scope: Automotive; Aviation; Rail; Waterborne. The projects are expected to cover all of the following production targets: Upscaling of components production Technologies: Optimisation and pilot-scale integration methods of anode and cathode materials compatible with next generation electrolytes Development of Cell Concepts, Manufacturing Equipment and Machinery Development of flexible and high-throughput processing methods for large-scale cell production (e.g., laser patterning, vacuum sintering, and advanced calendaring). Development of next-generation production machinery, tailored for next generation lithium-ion cell manufacturing (e.g., solid electrolyte deposition tools, high-precision stacking machines). Design and demonstration of module and packs into vehicles/relevant environment Develop module/pack design and relevant sensors and Battery Management Systems (BMS), optimised for supporting the system, for seamless cell-to-system integration, regulatory compliance, and specific end-user application requirements. Perform comprehensive validation, including performance, durability, and safety testing under realistic operational conditions, addressing thermal management, mechanical stress, vibration resistance, and electrical performance at relevant scales. The Commission initiative for Safe and Sustainable by Design [1] (SSbD) sets a framework for assessing the safety and sustainability of chemicals and materials which should be considered as a reference for project proposals. Whenever the expected exploitation of project results entails developing, creating, manufacturing and marketing a product or process, or in creating and providing a service, the plan for the exploitation and dissemination of results must include a strategy for such exploitation. The exploitation plans are expected to include preliminary plans for scalability, commercialisation, and deployment (feasibility study, business plan) indicating the possible funding sources to be potentially used (in particular the Innovation Fund). Proposals could consider the involvement of the European Commission's Joint Research Centre (JRC) [2] whose contribution could consist of performing experimental or desk-top research on battery performance or safety. Programme areas: Horizon Europe (HORIZON), Global Challenges and European Industrial Competitiveness, Climate, Energy and Mobility, Energy Supply, Energy Storage
Domestic Battery Materials and Component Manufacturing (part of $500M NOFO) is sponsored by U.S. Department of Energy (DOE) - Manufacturing Deployment Office (MDO), Office of Critical Minerals and Energy Innovation (CMEI). This topic area targets new commercial-scale facilities or upgrades to existing ones focused on manufacturing strategic battery components for energy and defense applications. Priority is given to projects addressing vulnerabilities in the battery supply chain, including synthetic graphite, cathode active materials, and specialty metals manufacturing (copper, aluminum, lithium); demonstrating feedstock and offtake agreements; showing competitiveness under current market conditions; and improving costs or yield through process innovation.
Executive Order 14421, signed August 26 and published in the Federal Register on August 31, 2026, prohibits acquisition or installation of covered foreign-produced bulk-power equipment — and applies notwithstanding any contract signed beforehand. DOE implementing rules are due by December 24. Here is what it means if federal grant or loan dollars are paying for the hardware.
Read articlePROSPECT, DE-FOA-0003662, puts up to $100 million into critical minerals education with no cost share and no eligibility restrictions. The arithmetic behind the two-year doubling target explains where the money actually has to go — and it is not mining engineering departments.
Read articleThe Hydrocarbons and Geothermal Energy Office's University Training and Research program funds coal, oil and gas, and geothermal R&D at U.S. colleges and universities — but every proposal must include a non-academic partner and must build training modules that outlive the award. The LOI deadline is October 1, 2026, with full applications 15 days later. Here is what that compressed window means and why the workforce framing changes what a competitive proposal looks like.
Read article