1,000+ Opportunities
Find the right grant
Search federal, foundation, and corporate grants with AI — or browse by agency, topic, and state.
This listing may be outdated. Verify details at the official source before applying.
Find similar grantsPage says Window 2 now accepting applications; no deadline on homepage (see /fccp2).
California Electric Vehicle Infrastructure Project (CALeVIP) Fast Charge California Project Window 2 is sponsored by California Energy Commission (CEC) / Center for Sustainable Energy. Provides commercial and infrastructure incentives to build out public clean transportation technology, supporting local green economic development.
Get a weekly digest of new grants like this
A free weekly digest of new foundation and federal funding opportunities as they're added to Granted. Unsubscribe anytime.
Or search similar grants →According to the current listing, eligibility includes: Property owners, contractors, businesses, and California Native American tribes. Confirm the full requirements in the official notice before applying.
The current listing shows up to $100,000 per charging port ($55 million total pool). Verify award ceilings, matching requirements, and allowable costs in the official notice.
Applications for California Electric Vehicle Infrastructure Project (CALeVIP) Fast Charge California Project Window 2 are due January 14, 2027. Build your timeline backwards from this date to cover registrations, approvals, and final submission checks.
California Electric Vehicle Infrastructure Project (CALeVIP) Fast Charge California Project Window 2 is funded by California Energy Commission (CEC) / Center for Sustainable Energy. Verify program details on the funder's official page before applying.
This opportunity targets applicants in California. If your organization operates elsewhere, check the official notice for location requirements.
Start from the official opportunity page linked in this listing — it carries the sponsor's submission instructions.
Past winners and funding trends for this program
The California Energy Commission released GFO-26-503 on October 23, 2026, the first Proposition 4 round of the Distributed Electricity Backup Assets program. It offers $2 million to $8 million grants for new zero-emission storage, load flexibility, distributed generation and microgrids that must dispatch during extreme events for at least three seasons. Because SB 105 reserves $12.5 million to $23 million for GRIP water utility projects, the competitive pool is smaller than the headline. What the solicitation requires and how to build a winning application before the November 5 workshop.
Read articleSPP Round 5, the first Prop 4 climate bond round, closes December 17, 2026 with $188.5 million, a $200,000 floor, an $8.5 million ceiling and no match. Round 4 had $590.2 million and funded 120 of 468 applications. Here is what the smaller pot means for odds, how the 100-point rubric works, and what applicants can still do in five weeks.
Read articleProp. 38, the $8.4 billion immunology research bond, led 56% to 44% the morning after the November 3, 2026 election. Here is what the statute says about who can get the grant money, the 20% indirect cap, and the timeline.
Read article