1,000+ Opportunities
Find the right grant
Search federal, foundation, and corporate grants with AI — or browse by agency, topic, and state.
Commercialization of Ultra-High Payload-to-Weight UAS Subsystems (DPA26BZ05-DV022) is sponsored by DARPA. This Direct to Phase II (DP2) SBIR seeks to mature and commercialize revolutionary Unmanned Aircraft System (UAS) subsystem designs capable of breaking the 4:1 payload-to-weight ratio.
It capitalizes on innovative concepts demonstrated in programs like the DARPA Lift Challenge, focusing on aggressive weight minimization, advanced materials, and novel propulsion. Military applications include tactical resupply and autonomous ammunition/ration delivery.
Get a weekly digest of new grants like this
A free weekly digest of new foundation and federal funding opportunities as they're added to Granted. Unsubscribe anytime.
Or search similar grants →The current listing shows not specified, SBIR Phase I and II generally range from $75,000 to $2M+. Verify award ceilings, matching requirements, and allowable costs in the official notice.
The published deadline was September 23, 2026, which has passed. Check the official notice for any future application windows before investing time in a proposal.
Commercialization of Ultra-High Payload-to-Weight UAS Subsystems (DPA26BZ05-DV022) is funded by DARPA. Verify program details on the funder's official page before applying.
Start from the official opportunity page linked in this listing — it carries the sponsor's submission instructions.
Past winners and funding trends for this program
DPA26BZ06-DV023 is a Direct-to-Phase-II SBIR paying $700,000 over 18 months plus a $500,000 option. The physics demands 256x more transmit power than the systems that qualify you to compete, and DARPA will not accept modeling alone as proof. Here is the eligibility wall, the five engineering problems, and who can realistically win it before the October 21 close.
Read articleRelease 6's SBIR topics got the attention. Its three STTR topics — SHIELDER, fuel-flexible electric propulsion, and hypersonic wind tunnel noise diagnostics — are all Direct-to-Phase-II, all require a research institution to perform at least 30 percent of the work, and all close October 21, 2026. The feasibility gates are the real filter.
Read articleDPA26BZ06-DV026 offers $300,000 at Phase I or $1,800,000 as a single Direct-to-Phase-II tranche with no options. The deliverable is a simulated auction market that measures whether AI agents deceive, collude, or manipulate the humans they serve — measured entirely from the outside. Here is the 90% efficiency gate, the team composition most bidders will get wrong, and why this topic sits in DARPA's biology office.
Read article