1,000+ Opportunities
Find the right grant
Search federal, foundation, and corporate grants with AI — or browse by agency, topic, and state.
This listing may be outdated. Verify details at the official source before applying.
Find similar grantsDisrupt. Build Infrastructure Grant is sponsored by Disrupt. Build.
Equity-free grant for core protocols and physical network infrastructure in the DePIN ecosystem, requiring an open-source codebase, technical documentation, and an MVP or proof of concept.
Get a weekly digest of new grants like this
A free weekly digest of new foundation and federal funding opportunities as they're added to Granted. Unsubscribe anytime.
Or search similar grants →Key questions and narrative sections extracted from the solicitation.
Key Information Questions: Standardized questions about project type, location, funding request, and parties involved
Project Description File: Provide a concise description of the project's purpose, scope, and location, including a detailed geographical description of the proposed project, a map of the project's location and connections to existing transportation infrastructure, and geospatial data describing the project location
Project Location File: Provide detailed geographical description of the project location, connections to existing transportation infrastructure, and geospatial data
Project Budget Files: Describe the project's budget in detail and plans for covering the full cost of the project from all sources, including the Federal share and any applicable matching funds
Merit Criteria File: Address each of the 8 primary merit criteria separately and in the order described in the NOFO — Safety; Environmental Sustainability; Quality of Life; Mobility and Community Connectivity; Economic Competitiveness and Opportunity (including tourism); State of Good Repair; Innovation; Partnership and Collaboration. Insufficient information to assess any criterion will negatively impact the project rating; merit reviewers will focus on this file and will not be required to reference links or other files.
Project Readiness File: Provide information sufficient to evaluate whether the project is reasonably expected to begin construction in a timely manner, including project schedule, required approvals and permits, NEPA class of action and status, public involvement progress, and project risks
Scoring criteria used to review proposals for this grant.
According to the current listing, eligibility includes: Open to projects with an open-source codebase and technical documentation. Confirm the full requirements in the official notice before applying.
The current listing shows $100,000. Verify award ceilings, matching requirements, and allowable costs in the official notice.
Disrupt.Build Infrastructure Grant is funded by Disrupt.Build. Verify program details on the funder's official page before applying.
Yes — this listing is flagged as national in scope, so applicants across the U.S. may apply, subject to the sponsor's other eligibility criteria.
Applications go through the funder's official portal — the Apply Now link on this page goes there directly.
The solicitation lists 8 required documents: SF-424 Application for Federal Assistance, Key Information Questions, Project Description File, Project Location File (including map and geospatial data), Project Budget Files (full project budget and funding sources), and Merit Criteria File (addressing all 8 merit criteria), among others (the full list is in the Required Documents section on this page). Check the official notice for formatting and page-limit rules.
Past winners and funding trends for this program
Heather Gerken presents a revamped Ford Foundation strategy to trustees this fall. In January, staff split into three units — one refining the new strategy, one maintaining current grants, and one designing tie-off funding for grantees who are not in Ford's future. The new strategy runs from January 2028. Here is what that 24-month gap means for grantees and everyone who wanted to become one.
Read articleThe Economic Development Administration's Build to Scale program is level-funded at $50 million for FY2026 across two competitions — the Venture Challenge and the Capital Challenge. Both require a 1:1 match and reward regional coalitions that spent months building a pipeline before the NOFO dropped. Here's how the program actually works and how to be ready when it opens.
Read articleNSF launched its Tech Accelerators initiative May 27, 2026, with up to $5M build-phase and $10M scale-phase awards across AgTech, MaterialsTech, OceanTech, and SciTech. The four topics — and what was conspicuously left out — reveal where federal commercialization dollars are heading.
Read article