1,000+ Opportunities
Find the right grant
Search federal, foundation, and corporate grants with AI — or browse by agency, topic, and state.
This listing may be outdated. Verify details at the official source before applying.
Find similar grantsThis program aims to establish five-year graduate-level university-led traineeship programs in power engineering, specifically leveraging emerging Wide Bandgap Semiconductor Power Electronics capabilities.
Get a weekly digest of new grants like this
A free weekly digest of new foundation and federal funding opportunities as they're added to Granted. Unsubscribe anytime.
Or search similar grants →According to the current listing, eligibility includes: U. S. -based academic institutions of higher education (colleges and universities) with accredited programs granting Master's and Ph. D. degrees in relevant fields. Confirm the full requirements in the official notice before applying.
The current listing shows up to $10 million in total, with up to $4 million for the first part of the program. Verify award ceilings, matching requirements, and allowable costs in the official notice.
DOE Traineeship in Power Engineering (Leveraging Wide Bandgap Power Electronics) is funded by U.S. Department of Energy (DOE) Advanced Manufacturing Office (AMO). Verify program details on the funder's official page before applying.
Past winners and funding trends for this program
The Labor Department's RESTART grants closed April 15, but the $81 million program is a map, not just a deadline. Up to 20 awards, $5.1M ceilings, and a priority list — AI infrastructure, nuclear, advanced manufacturing, domestic minerals — that signals the shape of the next workforce funding cycle. Here is how to read it and position for what comes next.
Read articleThe FY2026 federal funding map has tilted hard toward AI, critical minerals, energy, advanced manufacturing, and workforce development — while a new layer of political review asks whether each award advances administration priorities. Here is a strategic map of where the money is moving, and how to position a proposal for the new alignment screen without distorting the work.
Read articleThe full ASPECT NOFO (DE-FOA-0003647) posted September 4, 2026, eleven days later than the Notice of Intent predicted. The real document splits $58 million across two topic areas with anticipated award counts of 0-7 and 0-3, a cost share that jumps from 20 percent to 50 percent mid-project, a mandatory five-page concept paper due October 9, and a university eligibility restriction that decides team structure before anyone writes a word.
Read article