1,000+ Opportunities
Find the right grant
Search federal, foundation, and corporate grants with AI — or browse by agency, topic, and state.
This listing may be outdated. Verify details at the official source before applying.
Find similar grantsWRVEC offers a $250 rebate to residential customers for the installation of an ENERGY STAR certified AC Level 2 EV charging station. Limit: two rebates per location.
Get a weekly digest of new grants like this
A free weekly digest of new foundation and federal funding opportunities as they're added to Granted. Unsubscribe anytime.
Or search similar grants →According to the current listing, eligibility includes: Residential customers of White River Valley Electric Cooperative. Limit of two rebates per location. Confirm the full requirements in the official notice before applying.
The current listing shows $250. Verify award ceilings, matching requirements, and allowable costs in the official notice.
EV Charger Rebate is funded by White River Valley Electric Cooperative (WRVEC). Verify program details on the funder's official page before applying.
Start from the official opportunity page linked in this listing — it carries the sponsor's submission instructions.
Past winners and funding trends for this program
CDC-RFA-EH-27-0074 posted as a forecast September 22, 2026: 6 expected awards at $750,000 to $900,000. That is flat funding against the expiring cycle — and the only proven way in is the consortium model Arizona used to bring three states under one award.
Read articlePA-27-034, PA-27-035 and PA-27-036 replace the institute-specific R25 announcements that research education programs have been built around for a decade. NCI, NIDA and NIGMS have already expired theirs early. Here is what the consolidation actually changes: an 8% indirect cost ceiling, a US-citizens-and-permanent-residents participant rule, a cooperative agreement variant that only exists on one of the three, and no clinical-trial-allowed companion anywhere.
Read articleNIST is pausing all submissions under the CRDO Broad Agency Announcement (2025-NIST-CHIPS-CRDO-01) on September 15, 2026 for system upgrades — no white papers, no pre-negotiation packages, no investment fund applications until roughly November. Here is what the pause means for a $10M-minimum rolling BAA that runs through 2029, and how to use the dark window.
Read article