1,000+ Opportunities
Find the right grant
Search federal, foundation, and corporate grants with AI — or browse by agency, topic, and state.
This listing may be outdated. Verify details at the official source before applying.
Find similar grantsGreen Infrastructure Grant is sponsored by Illinois Environmental Protection Agency. Provides funding for projects aimed at reducing stormwater runoff and mitigating flooding, supporting best management practices that enhance natural water management systems.
Get a weekly digest of new grants like this
A free weekly digest of new foundation and federal funding opportunities as they're added to Granted. Unsubscribe anytime.
Or search similar grants →Extracted from the official opportunity page/RFP to help you evaluate fit faster.
Euna Grants - Environmental Protection Agency - Green Infrastructure Grant Opportunities (FY 2025) Green Infrastructure Grant Opportunities (FY 2025) Green Infrastructure Grant Opportunities Green Infrastructure Grant Opportunities (FY 2025) This Notice of Funding Opportunity (NOFO) is to advise potential applicants of the availability of grant funds through the Green Infrastructure Grant Opportunities (GIGO).
The Illinois Environmental Protection Agency (Illinois EPA) is seeking proposals for projects to construct green infrastructure best management practices (BMPs) that prevent, eliminate, or reduce stormwater runoff, reducing localized or riverine flooding in Illinois’ rivers, streams, and lakes.
Projects that implement treatment trains (multiple BMPs in series) and/or multiple BMPs within the same watershed are encouraged as they may be more effective and efficient than a single large green infrastructure BMP. BMPs may be located on public or private land.
For the purposes of GIGO, Green Infrastructure means any stormwater management technique or practice employed with the primary goal to preserve, restore, mimic, or enhance natural hydrology. Green Infrastructure includes, but is not limited to, methods of using soil and vegetation to promote soil percolation, evapotranspiration, and filtering or the harvesting and reuse of precipitation.
According to the United States Environmental Protection Agency (USEPA), localized and riverine flooding will likely become more frequent. Localized flooding happens when rainfall overwhelms the capacity of the drainage systems, while riverine flooding happens when river flows exceed the capacity of a river channel.
By reducing stormwater runoff, detaining water away from impacted areas, and reconnecting streams to their floodplains, GIGO can help reduce the number and duration of both localized and riverine flood events. Eligible GIGO projects, through the construction of BMPs, will decrease stormwater runoff prior to release into rivers, streams, and lakes, and include: 1.
reconnection of a stream with its floodplain (e.g., two-stage ditch, daylighting); 2. flow control of stormwater runoff at sites directly upstream or downstream of an impervious area that currently impacts rivers, streams, or lakes through stormwater runoff discharge; and/or 3. flow control of water generated from impervious surfaces associated with existing urban land use (such as roads and buildings).
Examples of Project Types/BMPs that may be funded through GIGO are provided below. The list is not all-inclusive, and inclusion of a BMP here does not equate to an automatic eligibility for funding under GIGO.
o Vegetated practices designed to facilitate the infiltration of stormwater through infiltration media and/or vegetation uptake (e.g., bioretention areas, swales, infiltration basins, and green roofs) o Practices which allow stormwater to infiltrate into underlying soil; (e.g., permeable pavement/pavers (roadway, alleys, and parking lots)); underground infiltration; and retention areas) DETENTION POND CREATION/RETROFIT o Projects which create a new wet detention basin o Projects which retrofit an existing dry retention basin into a wet detention basin o Projects which modify an existing wet detention basin to increase its stormwater retention capacity (e.g., additional freeboard) WETLAND CREATION/MODIFICATION o Projects which create a wetland to intercept runoff, reduce peak flows, decrease runoff volume to rivers, streams, and lakes o Projects which modify an existing wetland (within limits of State and federal law) to improve its stormwater retention capacity o Projects which reconnect a river, stream, or lake to its floodplain to increase water infiltration through access to larger water retention area and/or for a longer water retention period such as: - A two-stage ditch includes a ‘floodplain’ within its channel design.
- Daylighting restores an originally open-air watercourse previously diverted below-ground to an above-ground channel to allow the watercourse to reconnect with its floodplain. - A levee retrofit allows water access back to a specific area within its floodplain.
o Smaller BMPs (e.g., rain gardens, green walls, trees, tree boxes, infiltration planters, dry wells, pocket wetlands, etc.) and the BMPs listed above that are constructed throughout the watershed. This type of project benefits communities that do not have large tracts of land to convert into green infrastructure.
NOTE - Applicant must describe the ranking process used for watershed-wide projects to confirm that the BMP sites proposed address the most critical areas with structural and non-structural practices that, if properly managed, will provide the greatest stormwater runoff control for the longest duration.
o Projects that capture, divert, and store rainwater for later use (e.g., rain barrels and cisterns) o Projects which redirect flow from a roof, currently connected to a sewer system, into a rain barrel or to another area, usually a lawn or rain garden, where it can soak into the ground o Projects including both BMP design and its construction (See Funding Source Description for funding restrictions for design costs.)
Illinois EPA will prioritize and select projects, according to the ranking criteria outlined in the Evaluation and Scoring Section, that are most cost-effective and yield the largest potential for stormwater runoff control. BMPs proven effective to reconnect a waterbody to its floodplain or BMPs proven effective at reducing impacts from stormwater runoff will receive priority.
Project match requirements and selection criteria are provided later in this NOFO. The anticipated start date for approved projects is August 30, 2025. Project length is two years (24 months), unless otherwise approved by Illinois EPA.
Environmental Protection Agency christine. davis@illinois. gov Illinois EPA’s Green Infrastructure Grant Opportunities Program provides grant funds for projects that implement green infrastructure practices to prevent, eliminate, or reduce stormwater runoff, resulting in reduced localized and riverine flooding for the protection of Illinois' rivers, streams, and lakes.
Funding Opportunity Number https://il. amplifund. com/Public/Opportunities/Details/45aeb4c5-055a-4441-aeb8-d49eae66772b Funding Source Description GIGO utilizes funds distributed by the State of Illinois generated under the Build Illinois Bond Fund.
Illinois EPA expects to award a total of $5,000,000 and anticipates distributing this amount across two (2) to ten (10) awards. GIGO has a set maximum total grant award of $2,500,000 with a minimum grant award of $75,000. No more than 50% of the program total, per funding cycle, shall be allocated to any one applicant or project.
GIGO is a reimbursement program. The grantee must perform the work, pay project costs, and submit an invoice with supporting documentation before Illinois EPA will reimburse the grantee for any approved eligible costs. Illinois EPA shall only make reimbursements to the grantee and shall reimburse the grantee no more frequently than monthly.
The Illinois EPA may elect to partially fund an application by funding discrete portions or phases of the project scope of work. This could be due to ineligible components identified in the application or inadequate funds available to complete the entire project. GIGO is limited to BMP implementation and limited design expenses.
GIGO shall not compensate for indirect costs, overhead, equipment purchase, or administrative expenses associated with the execution of the project. GIGO may provide up to 75% of the approved project costs. The remaining 25% is the responsibility of the grantee and constitutes the match.
Match may include money spent or in-kind services utilized to complete the approved project tasks. Match can be provided by the grantee, sub-contractor, or project partners (e.g., State programs, private foundations, landowners). A grantee may match greater than 25%.
Proposed projects that benefit an environmental justice (EJ) area may be eligible for up to 85% of GIGO assistance, with the applicant responsible for 15% of the costs as match. Applicants may apply for more than one project; however, successful applicants shall only receive funding for more than one GIGO application if funds are available after all other successful applicants have been awarded funding.
Partial funding may be offered if sufficient funds are not available to fund an entire application. Design costs, up to $50,000 or 15% of the total BMP costs, whichever is less, are eligible for grant funds and/or as match. The design costs must be: 1) identified in the application budget, 2) incorporated into the grant agreement budget, and 3) incurred within the term of the grant agreement.
Examples of ineligible activities, tasks, and components that shall not be funded through GIGO are provided below.
The list is not all-inclusive: • Construction of BMPs affiliated with new construction and/or new development, • Removal or demolition of existing structures that are not interfering with proposed project, • BMP design without BMP construction, • Stormwater conveyance (exception: short distance to direct stormwater to a GIGO BMP), • Activities, BMPs, or BMP components that do not control, prevent, or address stormwater runoff to a river, stream, or lake, • Routine operation and maintenance or repair of existing BMPs (e.g., invasive species removal, culvert replacement, street sweeping, catch-basin cleaning), • Administrative and non-construction labor, equipment and supplies (non-construction), indirect costs, contingency, travel, outreach and education, monitoring, • Bonus or acceleration payments to contractors to meet contractual completion dates for construction; fees for failure to pay invoices on time, check overdrafts, etc., • Permit or certification (e.g., 401) fees, • Mitigation costs, and/or • Projects mainly used for habitat improvement, shoreline/streambank stabilization, channel stabilization, agricultural soil erosion control, sediment removal (dredging) support facilities (roads, sewer systems), historic preservation, water supply protection, recreation, or wastewater treatment.
However, if the project serves both eligible and ineligible components, GIGO funds may be provided for the eligible portion of the project, on a proportional basis. Costs incurred prior to the grant agreement’s effective term date or after its term ends are ineligible for reimbursement.
Costs incurred prior to the grant agreements’ effective date or after its term ends are ineligible as match unless otherwise approved as match by Illinois EPA. Grantees shall not use any subcontractors, outside associates, or consultants in connection with any services covered by a grant agreement unless specifically authorized by the Illinois EPA.
Grantees shall use procurement procedures that reflect applicable local and State of Illinois laws and regulations relating to any sub agreements for the performance of grant projects funded under GIGO. See the Funding Source Description for more information Other Funding Requirement Submission Timeline Additional Information The Illinois EPA shall not extend the application deadline date.
Incomplete applications shall not be considered for funding and preclude the Illinois EPA from making an award to the applicant. Applicants shall be notified if their application was not considered for funding due to an incomplete application.
Allow Multiple Applications Other Submission Requirements The applicant must describe how the project will be implemented and must propose specific, quantifiable units of BMPs to be installed (e.g., 1,000 feet of stream daylighting) to accomplish stormwater runoff control to an Illinois river, stream, or lake.
Interim milestones for implementing the BMPs (e.g., design, permitting, reporting) must also be identified along with an associated schedule for the completion of those milestones. The applicant must describe the expected outcomes of the project in terms of stormwater runoff for river, stream, and lake protection. Outcomes such as increased gallons of stormwater retained on-site from the project area are appropriate.
A complete GIGO application must include the following: a) Completed online application b) Location maps of project site and flood impacted areas c) Completed online Budget Section including fully detailed narrative section d) GIGO Project Details Spreadsheet (downloadable in online application) including stormwater volume and pollutant load reduction calculations e) Support Documentation (as applicable) • Engineers estimate of cost (as available) f) Illinois Works Jobs Program Act Forms (as appropriate) (linked to in online application) • Illinois Works Jobs Program Act - Apprenticeship Initiative Budget Supplement for Public Works Projects Funded by State Appropriated Capital Funds form or Request for Waiver or Reduction of Public Works Project Apprenticeship Goals form g) Grantee Conflict of Interest Disclosure Form (downloadable in online application) Individuals, Small Businesses, Others, Government Organizations, Education Organizations, Public Housing Organizations, Nonprofit Organizations, For-Profit Organizations Applicant Eligibility Information Beneficiary Eligibility Information Credentials Documentation Eligibility Information Additional Eligibility Information Applicant Eligibility: GIGO funds are available to any Grant Accountability and Transparency Act (GATA) Pre-Qualified entity that has legal status to accept funds from the State of Illinois.
These may include local watershed groups, land conservancies or trusts, public and private profit and nonprofit organizations and institutions, units of government (county, municipal, township, or state), universities and colleges, park districts and other local land managing agencies, soil and water conservation districts, and conservation organizations. Additional Information URL https://epa. illinois.
gov/topics/grants-loans/water-financial-assistance/gigo. html Additional Information URL Description Additional information about GIGO can be found on Illinois EPA’s GIGO webpage. It may be difficult to complete projects that include BMP design, engineering, permitting, and BMP implementation during a single grant period.
Applications for renewal or supplementation of existing projects are eligible to compete with applications for new grant awards. Contact the Watershed Management Section (217) 782-3362 to discuss application options for long-term projects. Award Administration Information The Illinois EPA shall specify the funding terms and specific conditions resulting from the Fiscal and Administrative and Programmatic Risk Assessments.
Administrative and National Policy Requirements The terms and conditions of the award shall be in the grant agreement. No grantee shall receive a grant or any other State or federal assistance that would provide 100% or more of the eligible project costs.
If the grantee of a GIGO award is at any time offered any State, federal, or local grant or any other funding source, to assist in the payment of expenses for which the GIGO payment has been issued, the recipient shall reimburse the State of Illinois for any GIGO grant funds used to pay expenses or offered to be paid under another grant or funding source. Each grantee must agree to comply with all applicable State requirements.
This includes Uniform Administrative Requirements, 2 C. F. R.
§ 200 and GATA. These can have a significant impact on the costs and complexity of a project.
GIGO grantees will be expected to submit signed assurances that they will comply with all State mandates, including: a) The Interagency Wetland Policy Act of 1989; 20 ILCS 830/: In accordance with the Interagency Wetland Policy Act of 1989, a grantee whose proposed project site is located on or within 250 feet of a wetland site listed on the National Wetlands Inventory will be required to comply with the requirements of this Act.
This includes developing a plan to minimize adverse impacts on wetlands or providing written evidence that the proposed project will not have an adverse impact on a wetland. Project must also comply with Federal Wetlands Protection regulations at 24 C. F.
R. § 58. 5(b)(2), which may require preparation of an Eight-Step Wetlands Review.
b) Illinois Endangered Species Protection Act; 520 ILCS 10/ and the Illinois Natural Area Preservation Act; 525 ILCS 30: Compliance requires consultation with the Endangered Species Consultation Program of the Illinois Department of Natural Resources to assure compliance.
The consultation process must be implemented to avoid or minimize adverse impacts to State-listed species and their essential habitats that may result from the actions of State and local units of government. Grantees must certify the completion of the consultation process.
c) Illinois Prevailing Wage Act; 820 ILCS 130/: The Illinois Prevailing Wage Act requires the payment of prevailing wages for all construction funded in whole or in part with State funds, including funds passed through to private firms.
Grantees shall comply with all requirements of the Prevailing Wage Act, including but not limited to, inserting into all contracts for construction a stipulation to the effect that not less than the prevailing rate of wages as applicable to the project shall be paid to all laborers, workers, and mechanics performing work under the award and requiring all bonds of contractors to include a provision guaranteeing the faithful performance of such prevailing wage clause as provided by contract.
Grantees will be required to report on Prevailing Wage Act compliance. If your project involves construction and/or equipment installation, go to https://www2. illinois.
gov/idol/Laws-Rules/CONMED/Pages/prevailing-wage-act. aspx for more information. d) Illinois Works Jobs Program Act; 30 ILCS 559/: Grantees must comply with requirements in the Illinois Works Jobs Program Act.
For projects with an estimated total project cost of $500,000 or more, the grantee will be required to comply with the Illinois Works Apprenticeship Initiative; 30 ILCS 559/20-20 to 559/20-25 and all applicable administrative rules.
The “estimated total project cost” is a good faith approximation, at the time an applicant submits a grant application, of the costs of an entire project being paid for in whole or in part by appropriated capital funds to construct a public work.
The goal of the Illinois Works Apprenticeship Initiative is that apprentices will perform either 10% of the total labor hours actually worked in each prevailing wage classification or 10% of the estimated labor hours in each prevailing wage classification, whichever is less. Grantees will be permitted to seek a waiver or reduction of this goal in certain circumstances pursuant to 30 ILCS 559/20-20(b).
The grantee must ensure compliance for the life of the entire project, including during the term of the grant and after the term ends, if applicable, and will be required to report on and certify its compliance.
e) Business Enterprise Program for Minorities, Females, and Person with Disabilities Act; 30 ILCS 575/: For grant awards of $250,000 or more, the grantee will be required to comply with the Business Enterprise Program for Minorities, Females, and Persons with Disabilities Act, which establishes a goal for contracting with businesses that have been certified as owned and controlled by persons who are minority, female, or who have disabilities.
The grantee must document a plan for compliance prior to the establishment of the grant agreement and ensure compliance through the life of the grant. f) The National Emission Standards for Hazardous Air Pollutants for Source Categories; 40 C. F.
R. § 63: These standards assure that, when existing buildings are demolished and/or renovated, people outside of those buildings (i.e., passers-by or neighborhood residents) are protected from airborne asbestos. If asbestos materials are involved in the rehabilitation work, the grantee must contact the Field Operations Section, Bureau of Air of the Illinois EPA to ensure compliance with Asbestos NESHAP.
In the grant agreement, the grantee shall be required to: • Certify that it does and shall comply with all provisions of the federal Internal Revenue Code (26 USC 1), the Illinois Income Tax Act; 35 ILCS 5/, and all rules promulgated thereunder, including withholding provisions and timely deposits of employee taxes and unemployment insurance taxes.
• Certify that it does and shall comply with the reporting requirements of the Federal Funding Accountability and Transparency Act of 2006; PL 109–282, September 26, 2006, 120 Stat 1186 with respect to federal Awards greater than or equal to $30,000.
• Certify that it shall adhere to the applicable Uniform Administrative Requirements, Cost Principles, and Audit Requirements, which are published in Title 2, Part 200 of the Code of Federal Regulations, and are incorporated herein by reference. See 44 Ill. Admin.
Code 7000. 30(b)(1)(A). • Certify that it and its sub-grantees shall: (i) be registered with the federal SAM if seeking an Award that is partially or fully paid by federal funds and registered with the State equivalent of SAM; (ii) be in good standing with the Illinois Secretary of State; and (iii) have a valid UEI (Unique Entity Identifier) number.
It is Grantee’s responsibility to remain current with these registrations and requirements. If Grantee’s status with regard to any of these requirements change, or the certifications made in and information provided in the Uniform Grant Application changes, Grantee’s must notify the Grantor in accordance with ARTICLE XVIII.
• Submit a “GIGO BMP Documentation Form Part I” with designs, maps, and pollutant load calculations for all BMPs, including BMPs installed with matching funds. The designs must be certified by a registered or licensed professional engineer of Illinois. The designs must be approved by the Illinois EPA, Bureau of Water, WMS prior to the start of BMP construction or implementation.
• Secure applicable State and federal permits for all BMPs, including BMPs installed with matching funds, prior to the start of their implementation. • Develop and submit a 10-year O&M Plan for each of the BMPs installed. This includes BMPs installed with matching funds.
O&M Plans must be approved by the Illinois EPA’s WMS before BMP implementation and are for a minimum of ten years starting from the completion of the BMP. • Submit a “GIGO BMP Documentation Form Part II” with cost documentation and pre- and post BMP photos and/or video of the project site.
• Submit personnel activity reports accounting on an after-the-fact basis for 100% of the employee’s actual time, separately indicating the time spent on the GIGO grant, other grants or projects, vacation or sick leave, and administrative time, if applicable. Specific reporting requirements will be communicated/outlined within the grant agreement.
Quarterly reports shall include a Periodic Financial Report, a Periodic Performance Report, and a Quarterly Narrative. All projects require a final project report. The grantee shall submit to the Illinois EPA, by the date specified in the grant agreement, a report explaining the execution of the project and evaluating the project’s success.
The report shall document the project tasks and summarize the findings, costs, and benefits of the project. State Awarding Agency Contacts If you have any programmatic questions regarding GIGO, this NOFO, or the Application, contact the Illinois EPA’s WMS staff at: Illinois Environmental Protection Agency Springfield, Illinois 62794-9276 Email: epa. bowgrants@illinois.
gov If you have fiscal and administrative questions regarding the grant application, Internal Controls Questionnaire (ICQ), or pre-qualifying through the GATA Grantee Portal, contact the Illinois EPA’s Fiscal staff at: Illinois Environmental Protection Agency Fiscal Springfield, Illinois 62794-9276 Email: epa. gata@illinois. gov Click at https://epa.
illinois. gov/topics/water-quality/surface-water/green-infrastructure. html for additional information about green infrastructure and GIGO.
Illinois EPA has the right to use (including, but not limited to, citing to, circulating, displaying, and reproducing) all products that result from the grantee receiving financial assistance under the grant agreement whether the product is developed by the grantee or a sub-grantee. Illinois EPA is not obligated to make any grant award as a result of this NOFO.
All GIGO applications shall be reviewed for technical merit, cost effectiveness, and adherence to the competitive grant evaluation criteria described in this NOFO. Applications shall undergo a comprehensive, merit-based review against the following criteria: Justification of Project Need (0 – 30 points): How far is the proposed project upstream or downstream of riverine or localized flooding?
Highest score to projects with 100 % of project site(s) within or directly adjacent to riverine or localized flooding. Lower score to projects with 50 % project site(s) more than 1,000 linear feet from riverine or localized flooding. Lowest score to projects with 50 % project site(s) more than 3,000 linear feet from riverine or localized flooding.
How large is the area impacted by riverine or localized flooding? Highest score to applications that document riverine or localized flood area, more than 12” deep and greater than 10 acres in size. Lower score to applications that document riverine or localized flood area, more than 4” deep and greater than 3 acres in size.
What percent of the flood impacted area is serviced by storm sewers? Highest score to applications that document flood areas with 100% storm sewer system coverage. Lower score to applications that document flood areas with 50% storm sewer system coverage.
How far is the proposed project upstream or downstream of a river, stream or lake? Highest score to projects with 100 % of project site(s) within or directly adjacent to river, stream, or lake. Lower score to projects with 50% project site(s), with storm sewer system coverage, more than 1,000 linear feet from river, stream, or lake.
Lower score to projects with 50% project site(s), with storm sewer system coverage, more than 3,000 linear feet from river, stream, or lake, with storm sewer system coverage. Lowest score to applications with project site(s), without storm sewer system coverage, more than 1,000 linear feet from river, stream, or lake. How many additional gallons of stormwater will the BMPs retain/detain?
This will be compared to all other applications. How long (in days) is the BMP designed to detain the captured stormwater? Highest score to the applications that document the best time to replenish the capacity to detain stormwater while providing a water quality benefit – this could include projects where some BMPs drain more quickly and their capacity to detain water is available sooner than another BMP with a slower draw down.
Lower score to applications with BMPs that take longer to replenish the capacity to detain stormwater. Lowest score to applications that do not replenish BMPs ability to detain stormwater on a recurring basis. Are the project BMPs methodologies and location appropriate for addressing and reducing flooding and/or problems resulting from stormwater runoff?
Highest score for projects where 100% of the BMPs and their locations are most appropriate to meet the mission of the GIGO NOFO. Lower score for projects where less than 100% of the BMPs and/or their location is most appropriate to meet the mission of the GIGO NOFO. Lower score for projects where an appropriate type of BMP is proposed, but a project location has not yet been determined.
What percent of the proposed project BMPs will reconnect the river, stream, or lake to its floodplain? Highest score for projects where 100% of the BMPs are designed to reconnect the river, stream, or lake to its floodplain. Lower score for projects where less than 100% of the BMPs are designed to reconnect the river, stream, or lake to its floodplain.
Lowest score for projects that do not reconnect the river, stream, or lake to its floodplain. Likelihood of Project Success (0 – 20 points) How many BMPs will be implemented? Highest score for single project or single treatment train.
Lower score for 2 – 5 projects or treatment trains. Lowest score for more than 6 projects. What percent of project site landowners have confirmed permission to implement the project?
Highest score to a project owned 100% by applicant. Lower score for project with multiple landowners that HAVE submitted written confirmation from ALL landowners that they plan to participate. Lower scores for those projects that have partial landowner confirmation.
Lowest score for projects without documentation of landowner to participate. What percent of project design(s) is complete? Highest score for project with PE stamped designs 100% complete.
Lower score to those with 60 – 90% designs completed. Lower score to applications with only a conceptual design. Lowest score to applications that only can provide a narrative of the proposed project.
What percent of required local, State, and federal permits have been secured? Highest score to a project which has secured all required permits. Lower score to a project that has some, but not all required permits.
Lower score to project that has submitted applications for all required permits. Lowest score to projects that can identify what is needed but have not submitted permit application(s). What percent of the project can be completed within 24 months?
Highest score to a project which can be completed in less than 24 months Lower scores to projects which can be completed in under 30 months. Budget/Cost-effectiveness (0 – 20 points) What percent of project budget is eligible? Highest score for application with 100% eligible project costs.
Lower score for application with less than 100% eligible costs. What percent of the budget line items are properly justified in the AmpliFund project budget narrative? Highest score for relevant explanation of 100% of project costs, including an engineer’s estimate of costs.
Lower score for partial explanation of less than 100% of project costs, including an engineer’s estimate of costs. Lower score for minimal explanation of project costs, including engineer’s estimate of costs. Lowest score for partial explanation of less than 100% of project costs.
What percent of the eligible match is secure? Highest score to projects that document 100 % of required match is ‘available immediately’. Lower score to projects that document that required match is ‘pledged’.
Lowest score to projects that document that required match is ‘applied for’. What is the project’s BMP cost/unit? This will be compared to all other applications.
What is the project’s cost of gallon of stormwater captured? This will be compared to all other applications. How much are the BMP design costs?
Highest score to projects that do not have design costs in the project budget. Lower score to projects that are less than $25,000 or 7. 5% of the BMP implementation cost, earmarked for design.
Lowest score to projects that have $50,000, or 15% of the BMP implementation cost, earmarked for design. Sustainability (0 – 10 points) What percent of the BMPs have a designed lifespan greater than 10 years? Highest score for projects that include 100% of BMPs with lifespan greater than 25 years.
Lower score for projects that include 50% of BMPs with lifespan greater than 25 years. The percent would be determined not by the number of BMPs, but by their ability to reduce stormwater runoff. Lowest score for projects that do not exceed the required 10-years of O&M.
Does the applicant propose a relevant and robust operation and maintenance (O&M) plan, including funds to implement said plan and identification of the entity responsible to implement the O&M plan? Highest score to application that outlines the O&M activities necessary for the proposed BMP, source of funding, and responsible entity that has a secured capacity to conduct the required work.
Lower score for projects that provide brief description of required O&M activities, source of funds, and responsible entity. Lowest score for minimal detail on activities, funding source, and responsible entity.
Infrastructure Plan Integration (0 – 10 points) Does the application document a local effort to coordinate green infrastructure planning with other infrastructure planning such as local ordinances or other BMP implementation efforts? Highest score goes to application that documents that the GIGO BMP is part of a larger layered effort (ordinances, planning, BMP implementation) to reduce stormwater runoff for flood reduction.
Lower score for applications that link the project to other BMP implementation Lowest score for applications that document the GIGO project as the only work happening within their jurisdiction. Environmental Justice (0 – 10 points) What percent of the flooded area to be protected by project is located within an Environmental Justice area?
Highest score goes to applications where 100% of the flood reduction is realized within an Environmental
According to the current listing, eligibility includes: Individuals, nonprofits, and government entities in Illinois. Confirm the full requirements in the official notice before applying.
The current listing shows $75,000 - $2,500,000. Verify award ceilings, matching requirements, and allowable costs in the official notice.
Green Infrastructure Grant is funded by Illinois Environmental Protection Agency. Verify program details on the funder's official page before applying.
This opportunity targets applicants in Illinois. If your organization operates elsewhere, check the official notice for location requirements.
Start from the official opportunity page linked in this listing — it carries the sponsor's submission instructions.
EPA's Innovative Water Infrastructure Workforce Development competition closes October 5, 2026. The agency says up to 15 awards across four project areas, but Project Area 1 alone carries a $7.8 million ceiling against a $10.8 million pot. That tension is the single most important strategic fact in the NOFO — here is how to read it, which lane is least competed, and what a three-week runway means for your submission.
Read articleEPA announced $3.5 million in competitive Clean Water Act Section 319 funding for Tribes on September 10, 2026, with a $175,000 per-applicant cap and roughly 20 awards. Applications close November 9, 2026. But eligibility was frozen as of October 10, 2025, and every application must contain an on-the-ground BMP project traceable to an approved management program. Here is how the gates actually work.
Read articleThe FY2026 Innovative Water Infrastructure Workforce Development Grant (EPA-OW-OWM-26-03) closes October 5, 2026 with $10.8 million, up to 15 cooperative agreements, and a Project Area 1 ceiling of $7.8 million. One maximum award would consume 72 percent of the pool. Here is how the four project areas actually partition the money, why the grants.gov award floor field is wrong, and why September 14 is the date that matters more than October 5.
Read article