1,000+ Opportunities
Find the right grant
Search federal, foundation, and corporate grants with AI — or browse by agency, topic, and state.
Illinois Shines Adjustable Block Program (SRECs) is sponsored by Illinois Power Agency. The Illinois Shines program provides incentives through the purchase of solar renewable energy credits (SRECs) based on the electricity a solar array is expected to produce over 15 years. This program offers upfront payments in exchange for these SRECs and can help reduce the cost of going solar for businesses.
Get a weekly digest of new grants like this
A free weekly digest of new foundation and federal funding opportunities as they're added to Granted. Unsubscribe anytime.
Or search similar grants →According to the current listing, eligibility includes: Most solar projects for commercial businesses and agricultural operations. Rates vary depending on block groups, geographic location, and utility. Projects reflecting unique energy needs, with a maximum size of 5 MW. Confirm the full requirements in the official notice before applying.
Illinois Shines Adjustable Block Program (SRECs) is funded by Illinois Power Agency. Verify program details on the funder's official page before applying.
Start from the official opportunity page linked in this listing — it carries the sponsor's submission instructions.
Past winners and funding trends for this program
Illinois DCEO's FY27 Tourism Attraction Grant ($1.8 million, $15,000 to $200,000) and Tourism Private Sector Grant ($600,000, $10,000 to $50,000) close November 13, 2026 at 5 p.m. Each expects about 20 awards. Applicants must already be GATA pre-qualified, nonprofits and governments must match 50% of project cost, for-profits 75%, and indirect costs are not allowed.
Read articleDPA26BZ06-DV023 is a Direct-to-Phase-II SBIR paying $700,000 over 18 months plus a $500,000 option. The physics demands 256x more transmit power than the systems that qualify you to compete, and DARPA will not accept modeling alone as proof. Here is the eligibility wall, the five engineering problems, and who can realistically win it before the October 21 close.
Read articleExecutive Order 14421, signed August 26 and published in the Federal Register on August 31, 2026, prohibits acquisition or installation of covered foreign-produced bulk-power equipment — and applies notwithstanding any contract signed beforehand. DOE implementing rules are due by December 24. Here is what it means if federal grant or loan dollars are paying for the hardware.
Read article