1,000+ Opportunities
Find the right grant
Search federal, foundation, and corporate grants with AI — or browse by agency, topic, and state.
Iowa LTAP Work Zone Sign Package Program is sponsored by Iowa Department of Transportation (Iowa DOT). This program aims to provide smaller cities (less than 10,000 population) with a basic work zone sign package that complies with the 2023 MUTCD, enhancing safety for operations personnel and motorists in work zones.
Get a weekly digest of new grants like this
A free weekly digest of new foundation and federal funding opportunities as they're added to Granted. Unsubscribe anytime.
Or search similar grants →Extracted from the official opportunity page/RFP to help you evaluate fit faster.
Iowa LTAP Work Zone Sign Package Program | Iowa Local Technical Assistance Program Iowa Local Technical Assistance Program Iowa LTAP | Iowa LTAP Work Zone Sign Package Program Iowa LTAP Work Zone Sign Package Program The Iowa LTAP Work Zone Sign Package Program The goal of this Iowa DOT funded program is to provide an avenue for smaller cities, less than 10,000 population, to be able to obtain a basic work zone sign package that is in compliance with the 2023 MUTCD and to make their work zones safer for operations personnel and motorists.
It is currently proposed that the materials to be included in the package will be the following: One Lane Road Ahead Signs Be Prepared to Stop Signs Each of these will be of the correct type and size for lower speed city street work. All of the devices will include high intensity retro-reflective sheeting suitable for nighttime use. The application period for 2026 is now closed.
The winners of the 2026 Small City Work Zone Sign Package Program are: If you have questions or need additional information, please contact Paul Albritton, palbritt@iastate. edu or call 515-294-1231.
According to the current listing, eligibility includes: Cities with a population of less than 10,000. Confirm the full requirements in the official notice before applying.
Applications for Iowa LTAP Work Zone Sign Package Program are due December 31, 2026. Build your timeline backwards from this date to cover registrations, approvals, and final submission checks.
Iowa LTAP Work Zone Sign Package Program is funded by Iowa Department of Transportation (Iowa DOT). Verify program details on the funder's official page before applying.
Start from the official opportunity page linked in this listing — it carries the sponsor's submission instructions.
U.S. DOT's FY26 SBIR Phase I solicitation opens June 3 and closes July 7 with awards in September. Ten topics across FHWA, FRA, FTA, NHTSA, and PHMSA at $200K–$300K each. Why the topic distribution telegraphs DOT's three-year R&D priorities and how niche specialists can win against generalist competitors.
Read articleDOT's FY26 SBIR Phase I opened June 3 and closes July 7 at 3:00 PM ET. Ten topics across FTA, PHMSA, FRA, FHWA, and Volpe span AI trip planning, thermochromic hazmat coatings, lithium-ion fire suppression, and V2X congestion mitigation — a tighter, more product-focused topic list than any of the bigger-name agencies.
Read articleAfter pulling the program from grants.gov in February 2025, FHWA reopened PROTECT with FY2024, FY2025 and FY2026 funds merged — $787 million, a 25 percent rural set-aside, a cost-share ladder you cannot climb in six weeks, and a new priority for converting bike and bus lanes back to general traffic.
Read article