1,000+ Opportunities
Find the right grant
Search federal, foundation, and corporate grants with AI — or browse by agency, topic, and state.
This listing may be outdated. Verify details at the official source before applying.
Find similar grantsNational Electric Vehicle Infrastructure Plan is sponsored by Colorado Department of Transportation (CDOT). This program supports the development and deployment of electric vehicle charging infrastructure in Colorado, aligning with the national electric vehicle infrastructure plan.
Get a weekly digest of new grants like this
A free weekly digest of new foundation and federal funding opportunities as they're added to Granted. Unsubscribe anytime.
Or search similar grants →Extracted from the official opportunity page/RFP to help you evaluate fit faster.
National Electric Vehicle Infrastructure Plan — Colorado Department of Transportation and tags on every page of your site. --> Established by the Infrastructure Investment and Jobs Act (IIJA), the National Electric Vehicle Infrastructure (NEVI) formula program funding will provide $5 billion over five years for states to deploy electric vehicle (EV) chargers along highway corridors.
This build-out of EV chargers is critical to accelerating the adoption of EVs and enabling Americans to access the economic and air quality benefits of electrified transportation. Colorado is expected to receive $57 million over the next five years to create an EV charging network across the state.
The Colorado Department of Transportation (CDOT) and the Colorado Energy Office (CEO) worked to deliver the State's final NEVI Implementation Plan. Colorado received Federal approval for its final plan on September 16, 2025.
The state’s NEVI plan outlines our strategy for utilizing the NEVI funds and addresses the establishment and evaluation of build-out goals, the role of contracting with third parties, public engagement, cybersecurity concerns, and more. NEVI funds will be distributed through the Colorado Energy Office's Direct Current Fast-Charging (DCFC) Plazas Program.
Please visit the DCFC Plazas webpage for the incentive structure and program resources, including the Application Guide and Application. This map depicts the current status of the DCFC Plazas funded charging stations as well as upgrade opportunity areas from non-Plazas funded DCFCs. Priority locations are sites that will be strongly considered for future funding rounds.
Alternative Fuel Corridor Designations The NEVI Program has a requirement that all funded projects be located within 1 mile of a federally designated alternative fuel corridor. In Colorado there are 16 designated corridors as illustrated in the map below. Each year CDOT has the opportunity to submit nominations for additional corridor designations.
If accepted, these new designations expand the number of locations that are eligible for NEVI funding. However, because Colorado already has state funding for EV charging through its Community Access Enterprise (CAE), every part of the state is already eligible for funding under the DCFC Plazas Program. Map of the Federally Designated Alternative Fuel Corridors in Colorado, including the Round 7 corridors.
This interactive map integrates the previous data from this page. Please refer to those datasets, static maps, tables, and data summaries if you are unable or have difficulty navigating this page. You can also reach out for help by emailing the Planning Department .
This map is currently down while we review applications. Check back again after Spring 2026 awards have been announced! Use these links to access and download the shapefiles that were used to create the static maps on this page, as well as the interactive project planning map.
Awarded Sites - All Rounds Designated Alternative Fuels Corridors
According to the current listing, eligibility includes: Agencies, organizations, and tribal governments within the State of Colorado that provide programs, projects, services, and strategies to reduce traffic crashes. Confirm the full requirements in the official notice before applying.
National Electric Vehicle Infrastructure Plan is funded by Colorado Department of Transportation (CDOT). Verify program details on the funder's official page before applying.
This opportunity targets applicants in Colorado. If your organization operates elsewhere, check the official notice for location requirements.
Start from the official opportunity page linked in this listing — it carries the sponsor's submission instructions.
House leadership canceled the September 21 and September 28 session weeks on September 3, leaving four legislative days before members leave until after the November 3 midterms. Three separate deadlines — the continuing resolution, the surface transportation extension, and the statutory freeze on OMB's grant-rule rewrite — now expire on the same day, with a lame-duck Congress and a handful of weeks to resolve them. Here is what that means for anyone holding or chasing a federal award.
Read articleInside FEMA's FY2026 Homeland Security Grant Program sit two transportation-specific programs that ferries, transit agencies, and port authorities keep leaving on the table. Here is what the $95M Port Security and $88.4M Transit Security programs actually fund, who is eligible, how the cyber-threat expansion changes the calculus, and how to build a July 24 application that survives risk-based review.
Read articleOn June 2, 2026, the Department of Energy's Office of Critical Minerals and Energy Innovation selected two demonstration-scale facilities — Phoenix Tailings (with MIT and the University of Minnesota) for $66 million, and the Colorado School of Mines (with ElementUSA, PNNL, Principal Mineral, and Rare Earth Technologies Inc.) for the balance — under the Rare Earth Elements Demonstration Facility Program. Both projects pull rare earths from industrial waste — red mud at the Gramercy refinery in Louisiana, and a mix of mine and refining tailings elsewhere. Here is what the selections tell researchers, small businesses, and downstream magnet customers about where DOE thinks the chokepoint actually is, and what to do before the next demonstration-scale solicitation opens.
Read article