PA Grid Resilience Grant is a grant from the Pennsylvania Department of Environmental Protection (DEP) that funds projects implementing resilience measures to mitigate the impact of electric grid disruptive events across Pennsylvania. Funded through a federal formula grant from the U.S. Department of Energy under the Infrastructure Investment and Jobs Act (IIJA), Section 40101D, awards can reach up to $8,000,000.
Eligible applicants include utilities and organizations involved in electric grid infrastructure. A 100% match is required for larger utilities; small utilities selling 4,000,000 MWh or fewer annually need only a one-third match. Future funding rounds will be announced on the Pennsylvania DEP website.
Round 2 guidance documents and application instructions are available from the program.
Get a weekly digest of new grants like this
A free weekly digest of new foundation and federal funding opportunities as they're added to Granted. Unsubscribe anytime.
Or search similar grants →Extracted from the official opportunity page/RFP to help you evaluate fit faster.
Pennsylvania Grid Resilience Grant Program | Department of Environmental Protection | Commonwealth of Pennsylvania Pennsylvania Grid Resilience Grant Program <b>What is the Pennsylvania Grid Resilience Grant Program (GRG)?
</b></p>\r\n<p>Funded by a state formula grant from the U.S. Department of Energy (USDOE) through the federal Infrastructure Investment and Jobs Act (IIJA), Section 40101D, titled Preventing Outages and Enhancing the Resilience of the Electric Grid, the GRG program is a funding opportunity to implement resilience measures throughout PA intended to mitigate the impact of electric grid disruptive events.
</p>\r\n<p><b>Future Rounds</b></p>\r\n<p>Information on future rounds of funding will be made available here when the program reopens. </p>\r\n<p><b>Grant documents</b></p>\r\n<ul>\r\n<li><a href=\"https://greenport. pa.
gov/elibrary/GetDocument? docId=6465859&DocName=PENNSYLVANIA%20GRID%20RESILIENCE%20GRANTS%20PROGRAM%20ROUND%202%20GUIDANCE%20DOCUMENT. PDF%20%20%3Cspan%20style%3D%22color%3Agreen%3B%22%3E%3C%2Fspan%3E%20%3Cspan%20style%3D%22color%3Ablue%3B%22%3E(NEW)%3C%2Fspan%3E%205%2F13%2F2027\" target=\"_blank\" rel=\"noopener noreferrer\">PA GRG Round 2 Guidance Document</a></li>\r\n<li><a href=\"https://greenport.
pa. gov/elibrary/GetFolder. aspx?
FolderID=919027\" target=\"_blank\" rel=\"noopener noreferrer\">Concept Paper Application and Instructions</a></li>\r\n<li><a href=\"https://greenport. pa. gov/elibrary/GetDocument?
docId=6309289&DocName=ROUND%202%20FULL%20APPLICATION%20AND%20INSTRUCTIONS. DOCX%20%20%3Cspan%20style%3D%22color%3Agreen%3B%22%3E%3C%2Fspan%3E%20%3Cspan%20style%3D%22color%3Ablue%3B%22%3E(NEW)%3C%2Fspan%3E\" target=\"_blank\" rel=\"noopener noreferrer\">Full Application and Instructions</a> (DOCX)</li>\r\n<li><a href=\"https://greenport. pa.
gov/elibrary/GetDocument? docId=9774774&DocName=DETAILED%20BUDGET%20-%20PENNSYLVANIA%20GRID%20RESILIENCE%20GRANT. XLSX%20%20%3Cspan%20style%3D%22color%3Agreen%3B%22%3E%3C%2Fspan%3E%20%3Cspan%20style%3D%22color%3Ablue%3B%22%3E(NEW)%3C%2Fspan%3E\" target=\"_blank\" rel=\"noopener noreferrer\">Detailed Budget - PA GRG</a> (XLSX)</li>\r\n</ul>\r\n"}}"> What is the Pennsylvania Grid Resilience Grant Program (GRG)?
Funded by a state formula grant from the U.S. Department of Energy (USDOE) through the federal Infrastructure Investment and Jobs Act (IIJA), Section 40101D, titled Preventing Outages and Enhancing the Resilience of the Electric Grid, the GRG program is a funding opportunity to implement resilience measures throughout PA intended to mitigate the impact of electric grid disruptive events.
Information on future rounds of funding will be made available here when the program reopens.
PA GRG Round 2 Guidance Document Concept Paper Application and Instructions Full Application and Instructions (DOCX) Detailed Budget - PA GRG (XLSX) An eligible entity that receives a grant award under the Program is required to match a minimum of 100 percent of the award amount if they are not considered a “Small Utility”, selling not more than 4,000,000 megawatt hours of electricity per year.
</p>\r\n<p>If the eligible entity sells not more than 4,000,000 megawatt hours of electricity per year, the required minimum match will be one third of the award amount. </p>\r\n<p>Matching funds means any new public or private investment in the proposed project made by an eligible applicant. Eligible applicants must provide letters documenting the financial commitment.
Eligible letters and matching fund use are discussed in the application requirements section of the PA GRG Round 2 Guidance Document. </p>\r\n"}}"> An eligible entity that receives a grant award under the Program is required to match a minimum of 100 percent of the award amount if they are not considered a “Small Utility”, selling not more than 4,000,000 megawatt hours of electricity per year.
If the eligible entity sells not more than 4,000,000 megawatt hours of electricity per year, the required minimum match will be one third of the award amount. Matching funds means any new public or private investment in the proposed project made by an eligible applicant. Eligible applicants must provide letters documenting the financial commitment.
Eligible letters and matching fund use are discussed in the application requirements section of the PA GRG Round 2 Guidance Document.
\r\n<li>an electric grid operator;</li>\r\n<li>an electricity storage operator; </li>\r\n<li>an electricity generator; </li>\r\n<li>a transmission owner or operator; </li>\r\n<li>a distribution provider; </li>\r\n<li>a fuel supplier; </li>\r\n<li>and any other relevant entity, as determined by DEP in consultation with DOE.
</li>\r\n</ul>\r\n"}}"> an electric grid operator; an electricity storage operator; an electricity generator; a transmission owner or operator; and any other relevant entity, as determined by DEP in consultation with DOE.
\r\n<li>weatherization technologies and equipment;</li>\r\n<li>fire resistant technologies and fire prevention systems;</li>\r\n<li>monitoring and control technologies;</li>\r\n<li>the undergrounding of electrical equipment;</li>\r\n<li>utility pole management;</li>\r\n<li>the relocation of power lines or the reconductoring of power lines with low sag;</li>\r\n<li>advanced conductors;</li>\r\n<li>vegetation and fuel load management;</li>\r\n<li>the use or construction of infrastructure for enhancing system adaptive capacity during disruptive events, including microgrids and battery storage subcomponents;</li>\r\n<li>Note: These projects are only eligible if used exclusively during disruptive events.
</li>\r\n<li>adaptive protection technologies;</li>\r\n<li>advanced modeling technologies;</li>\r\n<li>hardening of power lines, facilities, substations, or other systems; and</li>\r\n<li>the replacement of old overhead conductors and underground cables.
</li>\r\n</ul>\r\n"}}"> weatherization technologies and equipment; fire resistant technologies and fire prevention systems; monitoring and control technologies; the undergrounding of electrical equipment; the relocation of power lines or the reconductoring of power lines with low sag; vegetation and fuel load management; the use or construction of infrastructure for enhancing system adaptive capacity during disruptive events, including microgrids and battery storage subcomponents; Note: These projects are only eligible if used exclusively during disruptive events.
adaptive protection technologies; advanced modeling technologies; hardening of power lines, facilities, substations, or other systems; and the replacement of old overhead conductors and underground cables.
\r\n<li>Construction of a new –<ul>\r\n<li>electric generating facility; or</li>\r\n<li>large scale battery storage facility that is not used for enhancing system adaptive capacity during disruptive events; or</li>\r\n</ul>\r\n</li>\r\n<li>Cybersecurity.
</li>\r\n</ol>\r\n<p>Additionally, the following type of expenditures are ineligible:</p>\r\n<ul>\r\n<li>Costs associated with preparation of the PA GRG application; land acquisition; permits; landscaping; advertising; business start up costs; indirect costs (i.e., general administrative and overhead, contingency funds, etc.); travel, lodging, subsistence; conference or meeting expenses including catering, conference equipment and room rental.
</li>\r\n</ul>\r\n"}}"> electric generating facility; or large scale battery storage facility that is not used for enhancing system adaptive capacity during disruptive events; or Additionally, the following type of expenditures are ineligible: Costs associated with preparation of the PA GRG application; land acquisition; permits; landscaping; advertising; business start up costs; indirect costs (i.e., general administrative and overhead, contingency funds, etc.); travel, lodging, subsistence; conference or meeting expenses including catering, conference equipment and room rental.
\r\n<li>All Concept Papers, Full Application and Supporting Documentation must be submitted online through the Commonwealth's <a href=\"https://grants. pa. gov/Login.
aspx\" target=\"_blank\" rel=\"noopener noreferrer\">Enterprise eGrants system</a> (eGrants). Emails, hard copy mailings, or faxes will not be accepted. </li>\r\n<li>Applicants must submit a Concept Paper to be eligible to submit a Full Application.
</li>\r\n<li>The Concept Paper, Full Application, and required attachments must be complete, and the application must include all applicable items as outlined in the appropriate application instructions, and listed below. </li>\r\n<li>Please see Guidance Document, Concept Paper Instructions, and Full Application Instructions for more detailed information. </li>\r\n<li><a href=\"https://files.
dep. state. pa.
us/Energy/OfficeofPollutionPrevention/IIJA/PA_GRG_Concept_Paper_application_instructions. pdf\" target=\"_blank\" rel=\"noopener noreferrer\">PA GRG Enterprise eGrants System Step-by-Step Guide: Instructions for the Online Application</a> (PDF) - This is a guide for setting up an account and submitting your documents.
</li>\r\n</ul>\r\n"}}"> All Concept Papers, Full Application and Supporting Documentation must be submitted online through the Commonwealth's Enterprise eGrants system (eGrants). Emails, hard copy mailings, or faxes will not be accepted. Applicants must submit a Concept Paper to be eligible to submit a Full Application.
The Concept Paper, Full Application, and required attachments must be complete, and the application must include all applicable items as outlined in the appropriate application instructions, and listed below. Please see Guidance Document, Concept Paper Instructions, and Full Application Instructions for more detailed information.
PA GRG Enterprise eGrants System Step-by-Step Guide: Instructions for the Online Application (PDF) - This is a guide for setting up an account and submitting your documents. What Documents Do I Have To Submit?
Concept Paper</h3>\r\n<ul>\r\n<li><b>Concept Paper Supplemental Form </b>- This Form can be found within the Concept Paper Instructions Document above</li>\r\n<li><b>Detailed Concept paper </b>- This should explain what the scope of your project is and how this project will impact each of the categories listed in the guidance document/full application.
</li>\r\n<li><b>Small Utility Verification</b> – If applicable</li>\r\n</ul>\r\n<h3>Full Application</h3>\r\n<ul>\r\n<li><b><a href=\"https://greenport. pa. gov/elibrary/GetDocument?
docId=6309289&DocName=ROUND%202%20FULL%20APPLICATION%20AND%20INSTRUCTIONS.
DOCX%20%20%3Cspan%20style%3D%22color%3Agreen%3B%22%3E%3C%2Fspan%3E%20%3Cspan%20style%3D%22color%3Ablue%3B%22%3E(NEW)%3C%2Fspan%3E\" target=\"_blank\">Full Application Supplemental Form</a> </b>- This Form can be found within the Full Application Instructions Document</li>\r\n<li><b>Detailed Project Narrative</b></li>\r\n<li><b>Detailed Budget </b>- This should clearly show all expenditures for both grant and match.
Depending on the cost of a contractor or an individual piece of equipment additional documentation may be requested as stated in the document. <b>Note: Ensure Consideration of Davis Bacon Act requirements if applicable, for more information on this budget requirement please see the full application instructions. </b></li>\r\n<li><b>Letters of Commitment </b>- The Letter of Commitment must state the exact amount committed to the match.
</li>\r\n<li><b><a href=\"https://files. dep. state.
pa. us/Energy/OfficeofPollutionPrevention/GRG/Environmental_Questionaire. pdf\" target=\"_blank\">Environmental Questionnaire (NETL Form 451.
-1--1-3 P. 1)</a></b><ul>\r\n<li>Along with the Questionnaire Adequate Maps of the Project site will have to be submitted. NETL recommends Google Earth in order to provide sufficient detail.
</li>\r\n</ul>\r\n</li>\r\n<li><b>National Policy Requirement Waivers</b> - If Applicable</li>\r\n<li><b>Small Utility Verification (FORM EIA 861)</b> – If Applicable</li>\r\n<li><b style=\"font-size: 0.
875rem;\">Community Support Letters</b> (Optional)</li>\r\n</ul>\r\n"}}"> Concept Paper Supplemental Form - This Form can be found within the Concept Paper Instructions Document above Detailed Concept paper - This should explain what the scope of your project is and how this project will impact each of the categories listed in the guidance document/full application.
Small Utility Verification – If applicable Full Application Supplemental Form - This Form can be found within the Full Application Instructions Document Detailed Project Narrative Detailed Budget - This should clearly show all expenditures for both grant and match. Depending on the cost of a contractor or an individual piece of equipment additional documentation may be requested as stated in the document.
Note: Ensure Consideration of Davis Bacon Act requirements if applicable, for more information on this budget requirement please see the full application instructions. Letters of Commitment - The Letter of Commitment must state the exact amount committed to the match. Environmental Questionnaire (NETL Form 451.
-1--1-3 P. 1) Along with the Questionnaire Adequate Maps of the Project site will have to be submitted. NETL recommends Google Earth in order to provide sufficient detail.
National Policy Requirement Waivers - If Applicable Small Utility Verification (FORM EIA 861) – If Applicable Community Support Letters (Optional) Concept Papers will be received any time after the grant opening date of June 2, 2025, until the deadline of August 8, 2025, at 11. 59 PM*. All Concept Papers must be submitted online through the Commonwealth's <a href=\"https://grants.
pa. gov/Login. aspx\">Enterprise eGrants system</a>.
Emails, hard copy mailings, or faxes will not be accepted. </p>\r\n<p>Full Applications will be received any time after the second grant opening date of September 1, 2025, until the deadline of November 6, 2025, at 12:00 PM*. All Full Applications must be submitted online through the Commonwealth's <a href=\"https://grants.
pa. gov/Login. aspx\">Enterprise eGrants system</a>.
</p>\r\n"}}"> Concept Papers will be received any time after the grant opening date of June 2, 2025, until the deadline of August 8, 2025, at 11. 59 PM*. All Concept Papers must be submitted online through the Commonwealth's Enterprise eGrants system .
Emails, hard copy mailings, or faxes will not be accepted. Full Applications will be received any time after the second grant opening date of September 1, 2025, until the deadline of November 6, 2025, at 12:00 PM*. All Full Applications must be submitted online through the Commonwealth's Enterprise eGrants system .
How Will the Project Be Evaluated?
The following criteria is what will be evaluated:</p>\r\n<ul>\r\n<li>Targeting Investments to Worst Performing Circuits</li>\r\n<li>Improving Grid Reliability and Resilience</li>\r\n<li>Increasing Economic Resilience</li>\r\n<li>Ensuring Workforce Benefits</li>\r\n<li>Improving Environmental Benefits and Decreasing Greenhouse Gases (GHGs)</li>\r\n<li>Improving Outcomes in Rural and Urban Communities</li>\r\n<li>Project Readiness</li>\r\n</ul>\r\n<p>For more information or to see the metrics that will be reviewed please see the Guidance Document.
</p>\r\n"}}"> The following criteria is what will be evaluated: Targeting Investments to Worst Performing Circuits Improving Grid Reliability and Resilience Increasing Economic Resilience Ensuring Workforce Benefits Improving Environmental Benefits and Decreasing Greenhouse Gases (GHGs) Improving Outcomes in Rural and Urban Communities For more information or to see the metrics that will be reviewed please see the Guidance Document.
Other Considerations Before You Apply As a Federally Funded Grant, the Davis Bacon Act will apply to <u>most</u> projects please ensure that you are knowledgeable on if DBA will apply to you and consider both the prevailing wage and weekly payroll requirement in your application as it can have a big impact your expected budget. </p>\r\n<p>Please see the Davis Bacon Frequently Asked Questions sheet below.
</p>\r\n"}}"> As a Federally Funded Grant, the Davis Bacon Act will apply to most projects please ensure that you are knowledgeable on if DBA will apply to you and consider both the prevailing wage and weekly payroll requirement in your application as it can have a big impact your expected budget. Please see the Davis Bacon Frequently Asked Questions sheet below.
Frequently Asked Questions (PDF) Build America Buy America (BABA) As a Federally Funded Grant, Build America Buy America applies to all projects. When creating your application and budget please ensure that this is considered and that either the equipment will be able to comply with BABA or that you are prepared to submit a waiver request.
</p>\r\n<p>For more information on the BABA waivers please visit the following link: <a href=\"https://www. energy. gov/management/doe-buy-america-requirement-waiver-requests\">DOE Buy America Requirement Waiver Requests | Department of Energy</a></p>\r\n"}}"> As a Federally Funded Grant, Build America Buy America applies to all projects.
When creating your application and budget please ensure that this is considered and that either the equipment will be able to comply with BABA or that you are prepared to submit a waiver request.
For more information on the BABA waivers please visit the following link: DOE Buy America Requirement Waiver Requests | Department of Energy Shapiro Administration Invests over $10 Million to Strengthen Electric Grid Infrastructure and Help Prevent Power Outages | Department of Environmental Protection | Commonwealth of Pennsylvania Shapiro Administration Awards over $15 Million to Strengthen Rural Electric Grid and Prevent and Shorten Power Outages for Nearly 60,000 Pennsylvanians | Department of Environmental Protection | Commonwealth of Pennsylvania
According to the current listing, eligibility includes: Utilities and organizations involved in electric grid infrastructure and clean energy projects in Pennsylvania. Confirm the full requirements in the official notice before applying.
The current listing shows up to $8,000,000. Verify award ceilings, matching requirements, and allowable costs in the official notice.
PA Grid Resilience Grant is funded by Pennsylvania Department of Environmental Protection (DEP). Verify program details on the funder's official page before applying.
This opportunity targets applicants in Pennsylvania. If your organization operates elsewhere, check the official notice for location requirements.
Start from the official opportunity page linked in this listing — it carries the sponsor's submission instructions.
The Commonwealth Financing Authority's statewide Local Share Account program accepts applications September 1 through November 30, 2026, funding public-interest projects from $25,000 in eligible costs up to $1,000,000 per grant request out of Pennsylvania gaming revenue. Nonprofits are not eligible applicants and must be sponsored by a county, municipality, authority, or development agency. Here is how the sponsorship structure actually works, what the three-month window is really for, and why the ownership-and-maintenance clause decides more applications than the project narrative.
Read articleWhile headlines chase AI and defense money, USDA's National Institute of Food and Agriculture runs a tight summer competitive cycle — Equipment Grants (June 25), Agricultural Genome to Phenome (June 29), New Beginning for Tribal Students (July 2), and Crop Protection and Pest Management (July 6). Here is how the four programs fit together, who is eligible, and why the land-grant system has a structural edge.
Read articleS. 98 was signed into law May 13, 2026. The FCC must initiate vetting rulemaking by early November. Technical, financial, operational, and prior-compliance evidence are now statutory prerequisites for every future high-cost universal service applicant.
Read article