1,000+ Opportunities
Find the right grant
Search federal, foundation, and corporate grants with AI — or browse by agency, topic, and state.
This listing may be outdated. Verify details at the official source before applying.
Find similar grantsRequest for proposals: Lower Snake River energy replacement analysis is sponsored by Washington Department of Commerce. Commerce is accepting proposals from qualified organizations or firms to conduct a study that will identify the electricity generation, transmission, energy storage, energy efficiency and grid support Category: Climate & Energy.
Get a weekly digest of new grants like this
A free weekly digest of new foundation and federal funding opportunities as they're added to Granted. Unsubscribe anytime.
Or search similar grants →Extracted from the official opportunity page/RFP to help you evaluate fit faster.
Request for proposals: Lower Snake River energy replacement analysis – Washington State Department of Commerce Shared Standards Initiative 简体中文 ( Chinese (Simplified) ) 繁體中文 ( Chinese (Traditional) ) Tiếng Việt ( Vietnamese ) Request for proposals: Lower Snake River energy replacement analysis Request for Proposals (RFP) Pre-proposal conference: July 23, 2026 Answers to Q&A posted no later than Aug. 7, 2026 Proposals due: Aug.
26, 2026, by 4 p. m. Notify apparent successful contractor: Sept.
21, 2026 Commerce is accepting proposals from qualified organizations or firms to analyze the electricity resources needed to replace the energy services currently provided by the lower Snake River dams. The study will identify the electricity generation, transmission, energy storage, energy efficiency and grid support services needed to maintain a reliable and resilient electric system while meeting Washington’s clean energy laws.
It will also evaluate how these resources fit into the region’s future electricity needs as transportation, buildings and industry continue to transition away from fossil fuels. The analysis will build on previous work completed by the Pacific Northwest National Laboratory (PNNL) and, where practical, use methods developed by the Northwest Power and Conservation Council.
It must also align with Washington Executive Order 24-06 and support the goals of the Columbia Basin Restoration Initiative (CBRI). Commerce originally funded this work in 2023 through the Pacific Northwest Regional Energy Planning Process (PREPP) under the Resilient Columbia Basin Agreement (RCBA).
That agreement between the federal government and the Six Sovereigns — the states of Washington and Oregon, the Yakama Nation, the Nez Perce Tribe, the Confederated Tribes of the Umatilla Indian Reservation and the Confederated Tribes of Warm Springs, also called for studies examining how to replace the dams’ transportation, recreation and irrigation services.
The selected contractor will combine technical analysis with input from tribal governments, state and local governments, utilities, the Northwest Power and Conservation Council and other stakeholders. A draft report is due to Commerce by April 12, 2027, allowing time for review before Commerce submits the final report to the Governor and Legislature by June 30, 2027.
The contractor will be expected to complete a comprehensive analysis that includes the following: Identify the electricity generation, transmission, energy storage, energy efficiency and grid support services needed to replace the lower Snake River dams while maintaining a reliable, resilient and adequate electric system.
Develop one or more replacement resource portfolios that comply with Washington’s clean energy laws and support the goals of Executive Order 24-06 and the Columbia Basin Restoration Initiative. Use both technical analysis and stakeholder input from tribal governments, other governments, utilities, the Northwest Power and Conservation Council and other key partners.
Evaluate future electricity needs through 2050 by analyzing different scenarios for demand, technology development, costs, resource adequacy and reliability. Assess a range of commercially available resource options, including electricity generation, energy efficiency, conservation, demand response, energy storage and transmission, along with the time needed to develop and deploy them.
Examine how regional developments such as a renewed Columbia River Treaty, changes to Bonneville Power Administration preference contracts, the Western Resource Adequacy Program (WRAP) and western electricity markets could affect future resource needs. Compare different timelines and costs for developing the generation, transmission and storage resources needed to replace the dams.
Quantify greenhouse gas impacts, including lifecycle emissions, potential electricity imports, use of existing fossil-fueled generation and emissions associated with future electricity demand. Build on previous PNNL research and, where practical, use the data, models and analytical methods developed by the Northwest Power and Conservation Council.
Deliver a final report that summarizes the analysis, findings and recommended pathways to Commerce by April 12, 2027. Proposers must be available for work in Washington and: Have at least five years of demonstrated experience in electric system planning, transmission analysis, resource adequacy analysis, energy systems modeling or related fields.
Demonstrated three years of experience in conducting complex power system analysis or clean energy transition analyses. Register for the pre-proposal conference on July 23, 2026, at 2 p. m.
(recommended, but not mandatory) Submit your proposal to Dina Geiszler, RFP Coordinator at Dina. Geiszler@Commerce. wa.
gov by Aug. 26, 2026, at 4 p. m.
Pre-proposal conference recording Pre-proposal conference slide deck Dina Geiszler, RFP Coordinator Dina. Geiszler@Commerce. wa.
gov
According to the current listing, eligibility includes: See the Washington state grants portal for complete eligibility requirements. Confirm the full requirements in the official notice before applying.
Request for proposals: Lower Snake River energy replacement analysis is funded by Washington Department of Commerce. Verify program details on the funder's official page before applying.
This opportunity targets applicants in Washington. If your organization operates elsewhere, check the official notice for location requirements.
Start from the official opportunity page linked in this listing — it carries the sponsor's submission instructions.
Meyer pulled $6.5 million from a $200 million endowment. Greater Washington has deployed $14.3 million and put more than $1 million into Bridge Grants for 21 organizations — explicitly including mergers and organizational sunsets. Boston is funding merger facilitation. Here is how to tell which product an RFP is offering, and how to apply for the one you actually want.
Read articleGates committed $540.2 million over a decade to the Institute for Health Metrics and Evaluation — the largest gift in University of Washington history — while IHME's federal grant income falls from $7.3 million to a projected $4.8 million. The gift is a case study in the anchor-funder model: what it can do that federal money cannot, and the concentration risk it quietly underwrites.
Read articleIn January 2026, DOE Policy Flash PF-2026-30 wiped out every 15% and 10% indirect cost cap the administration had imposed in 2025 — because H.R. 6938 ordered it to. The same law froze indirect policy at NSF, Commerce and NASA. But OMB's sweeping new grants rule quietly reopens the fight through the back door. Here is what changed, what money recipients can claw back, and how to protect your indirect recovery going forward.
Read article