1,000+ Opportunities
Find the right grant
Search federal, foundation, and corporate grants with AI — or browse by agency, topic, and state.
This listing may be outdated. Verify details at the official source before applying.
Find similar grantsSpeed to Power through Accelerated Reconductoring and other Key Advanced Transmission Technology Upgrades (SPARK) is sponsored by US Department of Energy. Accelerates the deployment of transformative projects to ensure the reliability of the power sector’s infrastructure, providing affordable, reliable electricity to all American customers.
Get a weekly digest of new grants like this
A free weekly digest of new foundation and federal funding opportunities as they're added to Granted. Unsubscribe anytime.
Or search similar grants →According to the current listing, eligibility includes: Entities involved in advanced transmission technology upgrades. Confirm the full requirements in the official notice before applying.
The published deadline was May 20, 2026, which has passed. Check the official notice for any future application windows before investing time in a proposal.
Speed to Power through Accelerated Reconductoring and other Key Advanced Transmission Technology Upgrades (SPARK) is funded by US Department of Energy. Verify program details on the funder's official page before applying.
Yes — this listing is flagged as national in scope, so applicants across the U.S. may apply, subject to the sponsor's other eligibility criteria.
Start from the official opportunity page linked in this listing — it carries the sponsor's submission instructions.
Past winners and funding trends for this program
On September 21, 2026 DOE selected 21 projects under DE-FOA-0003472 — five EGS field tests and 16 exploration wells — for up to $99 million of a $171.5 million authorization. The solicitation is structured to reopen for up to 72 months on roughly annual cycles. Here is how to position for the next one.
Read articleDOE named 31 grid projects across 26 states for $1.9B on September 24, 2026. Recipients bring $3.35B of their own money. Here is what the selection list reveals about how to win the next GRIP round.
Read articleThe DOE Quantum Genesis Q Competition (DE-FOA-0003657) posted September 17, 2026 with an October 19 deadline. Phase I pays $250,000 then $1.25M on milestones; Phase II is a $100M pool plus two $50M bonus pools at 150 and 200 logical qubits. It is an Other Transaction Agreement, not a grant.
Read article