1,000+ Opportunities
Find the right grant
Search federal, foundation, and corporate grants with AI — or browse by agency, topic, and state.
Public comment period for SFY 2026-27 cycle open through June 12, 2026. Two-step submission process: abridged applications first, then full applications for selected projects.
"Texas Flood Infrastructure Fund (FIF)" is currently closed and not accepting applications.
Texas Flood Infrastructure Fund (FIF) is sponsored by Texas Water Development Board (TWDB). This program provides financial assistance in the form of loans and grants for flood control, flood mitigation, and drainage projects in Texas. Funding can be used for planning, design, construction, and rehabilitation of structural and non-structural flood projects.
Get a weekly digest of new grants like this
A free weekly digest of new foundation and federal funding opportunities as they're added to Granted. Unsubscribe anytime.
Or search similar grants →Extracted from the official opportunity page/RFP to help you evaluate fit faster.
Flood Infrastructure Fund (FIF) | Texas Water Development Board Flood Infrastructure Fund (FIF) Public Notice for Draft SFY 2026-27 Flood Infrastructure Fund Intended Use Plan SFY 2026-27 Draft Flood Infrastructure Fund Intended Use Plan Amended 2023 Regional Flood Plan Rankings: FMX Ranking Update Summary for SFY 2026-27 FIF IUP FME Ranking Workbook 2026 (PDF) FME Ranking Working 2026 (Excel) FMP Ranking Workbook 2026 (PDF) FMP Ranking Working 2026 (Excel) FMS Ranking Workbook 2026 (PDF) FMS Ranking Working 2026 (Excel) Public Comment Period Open The public comment period on the Draft SFY 2026-2027 Flood Infrastructure Fund (FIF) Intended Use Plan (IUP) begins Wednesday, May 13, 2026, and ends at 11:59 p.
m. CDT on Friday, June 12, 2026. To submit comments to the TWDB concerning the FIF IUP, complete the online public comment form.
If your comment includes attachment(s) email them to the Flood Infrastructure Fund Inbox . The solicitation for SFY 2024-2025 FIF abridged applications has closed. Any SFY 2024-2025 FIF Abridged Application received moving forward will be added to the bottom of the project prioritization list.
The public comment period for SFY 2026-27 FIF IUP is currently open and will close on June 12, 2026. Following the close of the public comment period, the TWDB will post the FIF abridged application on this webpage and begin the solicitation period. Abridged applications collect information required for project prioritization.
Projects that receive priority consideration will be invited to submit a complete application. Only Flood Management Evaluations (FME), Flood Mitigation Projects (FMP), and Flood Management Strategies (FMS) recommended in the approved state flood plan are eligible for financial assistance.
Authorized by the Texas Legislature and approved by Texas voters through a constitutional amendment, the FIF program provides zero interest loans and grants for flood control, flood mitigation, and drainage projects. The FIF IUP defines the structure and requirements of each funding cycle.
Passed by the Legislature and approved by Texas voters through a constitutional amendment, the FIF program provides financial assistance in the form of loans and grants for flood control, flood mitigation, and drainage projects. The Flood Intended Use Plan (IUP) details the structure of each funding cycle.
In addition to its administration of the FIF, the TWDB is working collaboratively with the Texas General Land Office (GLO) and Texas Division of Emergency Management (TDEM) to assist communities in determining which of the available funding sources for flood-related projects is the best fit for them.
The Flood Information Clearinghouse Committee (FLICC) represents an ongoing multi-agency effort to maximize the effective utilization of public funding resources and help communities identify the source they would like to pursue.
Flood Information Clearinghouse Committee In addition to administering the FIF program, the TWDB collaborates with the Texas General Land Office (GLO) and Texas Division of Emergency Management (TDEM) to help communities identify the most appropriate funding sources for flood-related projects.
The Flood Information Clearinghouse Committee (FLICC) represents an ongoing multi-agency effort to maximize the effective use of public funding resources. Frequently Asked Questions What activities are eligible for FIF assistance? What activities are eligible for FIF assistance?
The FIF program allows for a wide range of flood projects. Only Flood Management Evaluations (FME), Flood Mitigation Projects (FMP), and Flood Management Strategies (FMS) recommended in an amended regional flood plan approved by the TWDB are eligible for financial assistance.
Upon adoption of the first state flood plan in 2024, only FMEs, FMPs, and FMSs recommended in the Board-adopted state flood plan will be eligible for financial assistance.
Eligible project examples include, but are not limited to, the following: Planning Phase Activities Coordination and development of regional projects Obtaining regulatory approvals Hydraulic and hydrologic studies Construction/Rehabilitation Phase Activities Drainage infrastructure (e.g., channels, ditches, ponds, pipes, etc.) Flood control infrastructure Flood mitigation infrastructure Sustainable infrastructure Nonstructural flood mitigation Development of or amendments to flood related codes Rehabilitation of existing infrastructure taking into consideration methods of improved resiliency (not including costs associated with current or future operations and maintenance activities) Property acquisitions determined to be the best solution for highest-risk properties Restoration of riparian corridors, floodplains, coastal areas, and wetlands Natural erosion and runoff control Reasonable number of improvements to ancillary systems directly related to the project as determined by TWDB Nature-Based Solution Activities Green stormwater infrastructure Protection and restoration of riparian corridors, floodplains, coastal area, wetlands Other Eligible Activities The assistance is also able to support activities that may not traditionally be thought of as flood projects.
These include: Who is eligible to receive FIF assistance? Who is eligible to receive FIF assistance? Political subdivisions may apply for financial assistance for flood projects.
Specifically, eligible political subdivisions are cities, counties, and any district or authority created under Article III, Section 52 or Article XVI, Section 59 of the Texas Constitution. Other political subdivisions and nonprofit water supply corporations operating under Chapter 67 of the Texas Water Code are only eligible to apply for financial assistance for the Flood Management Evaluation (FME) Category (formerly Category 1).
What type of assistance is available? What type of assistance is available? The FIF program provides opportunities for loans with an interest rate of 0% and grants, with the methodology for determining the eligible grant amount based on the category in which the project falls.
How does the application and selection process work? How does the application and selection process work? The FIF application is a two-step process: Abridged Applications provide the TWDB with information needed to prioritize projects according to criteria described in further detail in the most recently approved Flood Infrastructure Fund IUP.
Applicants whose projects rank within the program's available capacity are invited to submit full financial assistance applications , which provide more detailed financial, legal, engineering, and other information. Once the technical review process has been completed, the project is presented to the Board for funding consideration. How may I determine if other sources of flood mitigation financing are available?
How may I determine if other sources of flood mitigation financing are available? Information from a submitted abridged application will be shared with the Flood Information Clearinghouse Committee (FLICC) , a new cooperative effort between the TWDB, General Land Office, Texas Division of Emergency Management, and other state and federal agencies that administer flood mitigation financial assistance programs.
After review by the FLICC, the applicant may be advised of other available source(s) of funding. Where can I get more information? Where can I get more information?
To provide you with a single point of contact at the TWDB, our project implementation staff is organized into seven regional project implementation teams. Each team is led by a manager that serves as the primary point of contact for both our existing and future customers. For assistance with the application or any questions related to your project, please look up contact information for your Regional Team .
Water Use Survey Requirement Applicants must have Water Use Survey responses on file for the preceding three years (31 TAC § 358. 5). Wholesalers are exempt from this requirement.
Applicants may review their surveys status and complete missing surveys on the Water Use Survey webpage.
SFY 2024-25 FIF Cycle Documents March 18 Flood Infrastructure Fund webinar SFY 2024-2025 Funding Cycle Flood Management Evaluations (FME) and Flood Mitigation Projects (FMP) Project Prioritization List Board Item SFY 2024-2025 Funding Cycle Flood Management Strategies Project Prioritization List Board Item Final SFY 2024-2025 Flood Infrastructure Fund Intended Use Plan SFY 2024-2025 FIF IUP FAQ Economically Distressed Areas Program (EDAP) Webinar SFY 2020 FIF Cycle Documents Board Adopted 2020 Flood Intended Use Plan (9/17/2020) Board Approved 2020 Structure of Financing and Terms of Subsidy (9/17/2020) Board Approved 2020 FIF Prioritization List and Eligible Funding Amounts (9/17/2020) 2020 Prioritization Scoring Detail (9/9/2020) TWDB FIF-Related Guidance Materials TWDB-0511: Guidance for the Preparation of Flood Mitigation Project Design Documents (Updated September 2020) TWDB-0554: Guidance for the Preparation of Flood Mitigation Project Engineering Feasibility Reports (Category 2 Only) (Updated September 2020) TWDB-0104: FIF Program Guidance Manual (All Categories – check back periodically for updates; updated June 2025) U.S. Census Bureau American Community Survey (ACS) Data U.S. Census Bureau 2024 ACS 5-year estimates
According to the current listing, eligibility includes: Political subdivisions (cities, counties, districts/authorities under the Texas Constitution). Nonprofit water supply corporations may only apply for Flood Management Evaluations. Confirm the full requirements in the official notice before applying.
The published deadline was June 12, 2026, which has passed. Check the official notice for any future application windows before investing time in a proposal.
Texas Flood Infrastructure Fund (FIF) is funded by Texas Water Development Board (TWDB). Verify program details on the funder's official page before applying.
This opportunity targets applicants in Texas. If your organization operates elsewhere, check the official notice for location requirements.
Start from the official opportunity page linked in this listing — it carries the sponsor's submission instructions.
EPA's Innovative Water Infrastructure Workforce Development competition closes October 5, 2026. The agency says up to 15 awards across four project areas, but Project Area 1 alone carries a $7.8 million ceiling against a $10.8 million pot. That tension is the single most important strategic fact in the NOFO — here is how to read it, which lane is least competed, and what a three-week runway means for your submission.
Read articleUSDA's Rural Decentralized Water Systems Grant funds nonprofits to capitalize a revolving loan fund for household wells and septic systems: 1 percent fixed, 20-year terms, $15,000 maximum per household. The application window closes September 30, 2026. The program is chronically under-subscribed for one structural reason — the 10 percent priority-point contribution cannot be in-kind. Here is the full instrument analysis and what it takes to win.
Read articleThe FY2026 Innovative Water Infrastructure Workforce Development Grant (EPA-OW-OWM-26-03) closes October 5, 2026 with $10.8 million, up to 15 cooperative agreements, and a Project Area 1 ceiling of $7.8 million. One maximum award would consume 72 percent of the pool. Here is how the four project areas actually partition the money, why the grants.gov award floor field is wrong, and why September 14 is the date that matters more than October 5.
Read article