1,000+ Opportunities
Find the right grant
Search federal, foundation, and corporate grants with AI — or browse by agency, topic, and state.
Water Desalination Grant Program (California) is sponsored by California Department of Water Resources. This program provides grants for projects focused on brackish water desalination, contaminant and salt removal, and salinity management to enhance California's water and drought resilience. Funded projects support the planning and development of potable water for municipal uses.
Get a weekly digest of new grants like this
A free weekly digest of new foundation and federal funding opportunities as they're added to Granted. Unsubscribe anytime.
Or search similar grants →Extracted from the official opportunity page/RFP to help you evaluate fit faster.
Water Desalination Grant Program Water Desalination Grant Program Water Desalination Grant Program Proposition 4 Funds for Brackish Desalination Proposition 4, Section 91016, allocates $62. 5 million for brackish desalination projects.
DWR’s Water Desalination Grant Program plans to award grants through a competitive application process for projects focused on brackish water desalination, contaminant and salt removal, and salinity management to enhance California's water and drought resilience. The Program is developing grant guidelines to award funding and will release the guidelines as they become available.
Desalination Grant Program Background DWR provides grants to local agencies for the planning, design, and construction of projects to desalinate naturally-occurring brackish and ocean water for potable water supply. It also provides grants for pilot, demonstration, and research projects. Grant funding is from Proposition 50 (2004) and Proposition 1 (2014).
As of May 2024, over $123 million in grants ranging from $45,000 to $10,000,000 have been awarded to 65 projects. Between 2005 and March 2018, DWR conducted four rounds of grant funding. After the fourth round, the program was modified to a Continuous Application Process (CAP), which enables applicants to submit projects at any time when grant funds are available.
DWR then reviews applications and awards grants in batches . Grant Application Process The rules and procedures for funding vary depending on funding source, availability of funds, and DWR priorities at the time of funding. Each round of funding generally starts with the drafting of a Proposal Solicitation Package (PSP), which contains detailed grant funding program rules and procedures for that round of funding.
The PSP has a description of types of agencies that can apply, types of projects that can be funded, instructions for application, the proposal review process, and the criteria for proposal selection for funding. The draft PSP is issued for public comment. After adoption of a final PSP, the application period begins.
Applications received by the deadline are reviewed according to the selection criteria, and a draft list of proposals recommended for grant funding is released for public comment. Subsequently, approved projects are awarded funding. DWR uses an online application tool called GRanTS.
An applicant must register to establish an account in GRanTS. Detailed procedures are described in the PSP applicable to the current round of funding. Applicants of awarded projects must enter into a Funding Agreement (contract).
Grant disbursements generally occur after costs are incurred and are provided after review of expense documentation provided by the grantee with invoices. After project completion, there may be annual reporting for up to five years to describe briefly the results of the project. The first three funding rounds used funds authorized by Proposition 50.
The fourth round and subsequent Continuous Application Process used funds from Proposition 1 and 50. The Continuous Application Process has been suspended. DWR is not accepting applications at this time.
Additional information can be found below: Continuous Application Process Continuous Application Process Suspended At this time the Continuous Application Process has been suspended. DWR is not accepting applications at this time. DWR implemented the Continuous Application Process, referred to as CAP, in March 2018.
CAP uses the same submittal and review process described in the Round 4 Proposal Solicitation Package (PSP) and is supplemented with the Continuous Application Process Guidance . Applications are reviewed and qualified projects awarded on a first-ready, first-served basis until all available funds are awarded. To date, DWR has awarded over $123 million in grants funded by Proposition 50 and Proposition 1.
Projects funded by the Water Desalination Grant Program have included feasibility studies, research, design pilots, and construction projects to support the evaluation, development, and implementation of potable groundwater and surface water desalination projects in California. CAP projects are listed below. CAP 1 – Total of $1.
3 million awarded on March 28, 2019 West Basin Municipal Water District - Decline Grant C. Marvin Brewer Desalter Facility Improvements Project Project was canceled. Grant returned to Program.
West Basin Municipal Water District Full-Scale Ocean Water Desalination Facility Environmental Documentation Environmental Documentation Los Robles Golf Course Groundwater Utilization (Phase 1-Feasibility Study) City of Simi Valley Water Department Feasibility Study to Develop the Simi Valley Groundwater Basin as a Potable Resource CAP 2 - Total of $14 million awarded on June 11, 2019 Southern California Edison Company Southern California Edison Catalina (Avalon) Desalination Plant 2 California American Water Company Monterey Peninsula Water Supply Project Robles Golf Course Groundwater Utilization Pilot Project CAP 3 -Total of $24.
1 million awarded on November 26, 2019 West Basin Municipal Water District - Decline Grant C. Marvin Brewer Desalter Facility Improvements Project Project was canceled. Grant returned to Program.
Southern California Edison Company Southern California (Avalon) Salt-Water Well, Desalination Facility, Storage & Distribution System Closed Circuit Reverse Osmosis (CCRO) Project CAP 4 – Total of $562,500 awarded on May 26, 2021 San Diego County Water Authority Lewis Carlsbad Desalination Plant Wedge-wire Screen Demonstration Project CAP 5 – Total of $5.
04 million awarded on March 1, 2023 Water Replenishment District of Southern California Brewer Well Optimization Project at Goldsworthy Desalter Oneka Seawater Desalination Buoy Design Pilot Study Desalination and On-Farm Recycling Project CAP 6 - Total of $1 million awarded on May 12, 2025 Mission Basin Groundwater Purification Facility Well Expansion and Brine Minimization Project Types for Continuous Applications The Water Desalination Grant Program reopened the CAP for Construction and Design Pilot applications in September 2024.
Grants awarded from these funds are referred to as CAP6. Construction project generally consists of the design and construction of a full-scale permanent desalination facility and related infrastructure to result in an operable municipal water supply project. A construction project can include funding for design, but design will not be funded as a stand-alone project.
Construction projects that depend upon future phases for an operable facility are not eligible.
Design Pilot project is a small-scale prototype for a full-scale project or a full-scale component of a project and is intended to refine design criteria, aid site selection, or study particular technologies or methodologies (conventional or innovative) for the purpose of implementing an already proposed full-scale municipal desalination facility.
Public webinar on Continuous Application Process (CAP 6) GRanTS open to begin accepting applications through the Continuous Application Process CAP6 Applications Due at 5:00pm Release of CAP6 Draft Funding Recommendations Public webinar on the Draft Funding Recommendation for Public Review for the Continuous Application Process (CAP 6) Release of CAP6 Grant Awards Continuous Application Process Guidance - This brief document provides additional information for topics such as notifying DWR of the application submittal through GRanTS and how funding recommendation notifications will occur.
Proposal Solicitation Package: Round 4 Proposal Solicitation Package (PSP) - Describes the overall application process. Errata - Provides corrections and clarifications to the PSP. Application Attachment Templates and Additional Guidance Send email to DesalPSP@water.
ca. gov to request these files. The on-line Grant Review and Tracking System ( GRanTS ) has two general parts: Completion of the online form and question within GRanTS Up to 22 electronic files, depending on the project type, as shown below: Links to the attachments with templates will be provided upon request.
For attachments with a provided template, the template is required to be used. The other attachments require the applicant to provide the requested information in files they create or as existing documents. Guidance is also provided below for Attachment 20, Economic Analysis.
See more information in the following table Required for Construction Application Required for Design Pilot Application Water Legislation Compliance Cost Share Funding Contributions Technical/Scientific Merit Greenhouse Gas Emission Estimations Outreach and Community Involvement Environmental Documentation Project Plans and Specifications Project Team Qualifications Plan of Study for Feasibility Study Reduction or Waiver of Cost Share for Disadvantaged Communities * Send email to DesalPSP@water.
ca. gov to request these files. If an applicant is resubmitting an application that was previously submitted to DWR, please include the form entitled Status of Attachments Resubmitted under the Continuous Application Process as part of the application when resubmitting an amended proposal previously reviewed under and not yet funded within this Water Desalination Grant Program.
See the Application Resubmittal Section of the Continuous Application Process Guidance for additional information on resubmittals. 2017 Desalination Grant Funding Round 4 2017 Grant Funding (Round 4) On Sept. 1, 2017, DWR received 30 proposals for the Water Desalination Grant Program, Round 4, funded by Proposition 1.
The total request for funding was approximately $139 million for the 30 projects, with estimated total project costs of $622. 5 million. DWR is awarding funds to nine proposals, for a total of $44.
4 million. These projects are in the following table. Reactivation of the Charles E.
Meyer Desalination Plant North Pleasant Valley Groundwater Desalter Project South Coast Water District Doheny Ocean Desalination Phase 1 Project City of Antioch Brackish Water Desalination Project Eastern Municipal Water District Enhanced Brine Concentration Design Pilot Project Olivenhain Municipal Water District San Dieguito Valley Brackish Groundwater Desalination Indian Wells Valley Water District Indian Wells Valley (IWV) Brackish Groundwater Feasibility Study Water Replenishment District of Southern California Feasibility Study for the West Coast Basin Brackish Water Reclamation Project University of Southern California System Configurations and Cooling Technologies for Waste-Heat-Driven Membrane Distillation in Desalination Applications with High Water Recovery Total Funding: $44,437,474 A public meeting to receive comments on the draft funding recommendations was held on February 5, 2018 at Metropolitan Water District’s headquarters (presentation).
Information on this meeting and the Notice of Public Meeting and Comment Period on Draft Funding Recommendation Water Desalination Grant Program Round 4 - Proposition 1 Grants, January 24, 2018, can be requested by sending an email to desalpsp@water. ca. gov .
This fourth round of grant funding includes funding for 5 types of projects as follows (see the PSP for full descriptions of project types): Construction projects generally consist of the design and construction of a full-scale permanent desalination facility and related infrastructure to result in an operable municipal water supply project.
A Construction project can include funding for design, but design will not be funded as a stand-alone project. Construction projects that depend upon future phases for an operable facility are not eligible.
Feasibility Study projects are used to determine the need for a water supply project, to analyze the alternatives to meet the project objective, to determine whether a desalination project is the “preferred alternative”, and if it is, to identify the implementation steps for the project.
Environmental Documentation projects are stand-alone projects for compliance with CEQA or National Environmental Policy Act (NEPA) where the basic feasibility study has already been completed and there is a likelihood for initiation of a construction project. As a requirement for funding, the completed portions of the feasibility study must be submitted with the application.
Design Pilot project is a small-scale prototype for a full-scale project or a full-scale component of a project and is intended to refine design criteria, aid site selection, or study particular technologies or methodologies (conventional or innovative) for the purpose of implementing an already proposed full-scale municipal desalination facility.
Research Pilot projects are typically small-scale prototypes for a full-scale device, equipment, process, or other technology and are intended to advance the knowledge base of new desalination technology, related infrastructure, and by-products treatment and disposal. Application Attachment Templates and Additional Guidance The completed application consisted of both an online submittal and one hard copy to DWR.
The on-line Grant Review and Tracking System (GRanTS) had forms and questions that needed to be completed. In addition, up to 22 additional electronic files were provided to DWR as part of the grant application package. Attachments with templates and guidance can be requested by sending an email to desalpsp@water.
ca. gov .
Attachment 1 – Signature Page Attachment 2 – Proposal Authorization Attachment 3 – Other Participating Organizations Attachment 4 – Funding Contributions Attachment 10 – Project Budget Attachment 11 – Project Schedule Attachment 12 – Greenhouse Gas Estimation (Principle Desalination Component only) Attachment 13 – Outreach, Community Involvement, and Acceptance Attachment 20 – Economic Analysis Guidance for Attachment 20, Economic Analysis (including Narrative Template).
Economic Analysis Computations Template . Attachment 22 – Reduction or Waiver of Cost Share for Disadvantaged Communities or Economically Distressed Areas. Frequently Asked Questions (FAQs) Additional information on various topics and issues in the form of questions & answers.
FAQs may be requested by sending an email to desalpsp@water. ca. gov .
State Funding Agreement (FA) Sample A sample funding agreement has been provided for review here ( PDF ). The actual agreement for Round 4 or subsequent funding may differ. Proposal Solicitation Package (PSP) The draft guidelines for conducting the Round 4 grant solicitation were contained in the Public Review Draft of the Round 4 Proposal Solicitation Package.
The PSP contains detailed grant funding program information, including eligibility, application submittal process, review and award process, and program guidelines and requirements. Final PSP. The final Round 4 PSP was adopted on June 16, 2017.
End of 2017 Grant Funding (Round 4) In November 2002, California voters passed Proposition 50, the Water Security, Clean Drinking Water, Coastal and Beach Protection Act of 2002 (incorporated into Division 26. 5 of the California Water Code, beginning with section 79500 ). Section 79545(a) in Chapter 6 provided $50 million for grants for desalination of ocean or brackish water.
Sections 79547 and 79547. 2 in Chapter 6 have other conditions that apply to this funding. Subsequent to passage of Proposition 50, the California State Legislature passed “trailer bills” that contain additional requirements for implementation of Proposition 50.
Proposition 50, as passed by voters Division 26. 5 of the California Water Code , including trailer bill sections. In November 2014, California voters passed Proposition 1, a part of which is the Water Quality, Supply and Infrastructure Improvement Act of 2014 (California Water Code, Division 26.
7, Section 79700 et seq.) Chapter 9 of Proposition 1 (the proper legal reference is Chapter 9 of Division 26. 7 of the Water Code, Sections 79765-79768) provides $725 million for grants/loans for water recycling and advanced treatment, including desalination projects.
DWR’s Water Desalination Grant Program will incorporate the Proposition 1 desalination elements in Section 79765(b), (d), and (f). The portion of funds allocated to desalination is $100 million, 7 percent of which is reserved for bonds and program administration. Proposition 1 funding of desalination shall be administered consistent with Proposition 50 desalination programs administered pursuant to sections 79545 and 79547.
2 of the Water Code. These funds will be appropriated over several years. The current plan for budgeting these funds is shown in the following table.
Voter approved General Obligation Bond State Agency Bond Financing Costs Programmatic Implementation Funding Program Administration (5%) Programmatic Administrative Costs Available for Grant Recipients Fiscal Year (FY) 15/16 and FY 18/19 appropriation Proposition 1 as passed by voters Division 26. 7 of the Water Code , including any additions by later legislation.
Newsletters and Subscriptions Receive news and updates on the Water Desalination Grant Program. If you need any additional information, please contact DWR’s Water Recycling and Desalination Section. Sean.
Sou@water. ca. gov | (916) 902-7722 Jennifer.
Pulido@water. ca. gov | (916) 902-7185 Desalination Grant Program Continuous Application Process Round 4 Final Awards Announced Updates and Public Notices Final Revised Guidelines Released for Advance Payment Authority for Various Local Assistance Programs Several programs were amended to include the ability to provide advance funds to public and nonprofit grantees under certain circumstances and in accordance with State law.
New Desalination Facility is a Major Milestone for Drought-Smart Infrastructure Solutions in the Delta Following several years of planning and investment, the City of Antioch has reached a climate-resilient milestone: a new brackish water desalination facility near its existing water treatment plant.
New DWR Grants Funded by Proposition 4 The California Department of Water Resources (DWR) will soon have new grant funding available to help advance California’s climate resilience goals, made possible by Proposition 4 - the Safe Drinking Water, Wildfire Prevention, Drought Preparedness, and Clean Air Bond Act of 2024.
Draft Funding Recommendation Water Desalination Grant Program The Department of Water Resources’ (DWR) Water Desalination Grant Program has completed reviewing the grant applications submitted through the Continuous Application Process (CAP).
Delta Conveyance Project: 2024 – 2026 Proposed Geotechnical Activities Delta Plan Consistency Water Education Materials Visit Natural Resources Website Department of Water Resources Visit Director Profile Page
According to the current listing, eligibility includes: Local public agencies, Tribes, and nonprofit organizations are typically eligible. Confirm the full requirements in the official notice before applying.
Water Desalination Grant Program (California) is funded by California Department of Water Resources. Verify program details on the funder's official page before applying.
This opportunity targets applicants in California. If your organization operates elsewhere, check the official notice for location requirements.
Applications go through the funder's official portal — the Apply Now link on this page goes there directly.
Past winners and funding trends for this program
EPA's Innovative Water Infrastructure Workforce Development competition closes October 5, 2026. The agency says up to 15 awards across four project areas, but Project Area 1 alone carries a $7.8 million ceiling against a $10.8 million pot. That tension is the single most important strategic fact in the NOFO — here is how to read it, which lane is least competed, and what a three-week runway means for your submission.
Read articleUSDA's Rural Decentralized Water Systems Grant funds nonprofits to capitalize a revolving loan fund for household wells and septic systems: 1 percent fixed, 20-year terms, $15,000 maximum per household. The application window closes September 30, 2026. The program is chronically under-subscribed for one structural reason — the 10 percent priority-point contribution cannot be in-kind. Here is the full instrument analysis and what it takes to win.
Read articleThe FY2026 Innovative Water Infrastructure Workforce Development Grant (EPA-OW-OWM-26-03) closes October 5, 2026 with $10.8 million, up to 15 cooperative agreements, and a Project Area 1 ceiling of $7.8 million. One maximum award would consume 72 percent of the pool. Here is how the four project areas actually partition the money, why the grants.gov award floor field is wrong, and why September 14 is the date that matters more than October 5.
Read article