1,000+ Opportunities
Find the right grant
Search federal, foundation, and corporate grants with AI — or browse by agency, topic, and state.
Funding is periodic; NOFOs are posted on Grants.gov when funding is available. No current deadline listed on the program page.
Watershed Cooperative Agreement Program (WCAP) is sponsored by Office of Surface Mining Reclamation and Enforcement (OSMRE). Provides funding to 501(c)(3) nonprofit organizations for projects addressing acid mine drainage (AMD) from abandoned coal mines to restore watersheds and improve water quality. Supports local reclamation efforts tied to mining impacts and environmental governance.
Get a weekly digest of new grants like this
A free weekly digest of new foundation and federal funding opportunities as they're added to Granted. Unsubscribe anytime.
Or search similar grants →Extracted from the official opportunity page/RFP to help you evaluate fit faster.
Watersheds | Office of Surface Mining Reclamation and Enforcement Watersheds are geographic regions that drain to the same body of water (from higher elevations to lower elevations). Each stream, river, lake, ocean etc. has its own watersheds and can be a part of a watershed for a larger body of water. Watersheds include both surface and groundwater.
Watershed Cooperative Agreement Program (WCAP) The Watershed Cooperative Agreement Program (WCAP) is an OSMRE program that supports local watershed restoration efforts by providing funds to small watershed organizations. WCAP funding is typically capped at a maximum of $100,000 per project to complete local acid mine drainage (AMD) reclamation projects.
To be eligible for WCAP funding, an organization must be a not-for-profit organization that is tax exempt under 26 U.S.C. 501(c)(3) of the Internal Revenue Code and project sites must meet eligibility requirements outlined in SMCRA Section 404. When WCAP funding is available, a Notice of Funding Opportunity (NOFO) is posted on Grants.
gov . Additional information on WCAP can be found in Chapter 6-100 (page 250) of the OSMRE Federal Financial Assistance Manual.
Examples of Completed WCAP Projects Period of Performance: 2018-2020 The State of Iowa partnered with Pathfinders RC&D, who regularly attended progress meetings and promoted the project and partnership through its electronic newsletter, media releases, and monthly updates to the Soil and Water Conservation Districts and County Supervisors. The project site is located in Davis County, Iowa and is 34 acres in size.
Acid Mine Drainage from this area directly impacts an un-named tributary to Salt Creek. The project involved reclaiming a site that was a source of acid forming materials that degraded the immediate habitat and a nearby water body through erosion, acidity and mineral deposits. The site was stabilized through the neutralization of the acid forming material and establishment of vegetation to stabilize the slopes.
Period of Performance: 2017-2020 The Ilesboro Road project was completed in 2020 through the Raccoon Creek Partnership with the Ohio Department of Natural Resources (ODNR), Division of Mineral Resources Management and the Ohio University Voinovich School of Leadership and Public Affairs.
The project was funded in 2017 as a land reclamation project that reclaimed thirty-four acres of abandoned spoil piles and two abandoned pits in Hocking County, Ohio. Run-off from the spoil piles and large amounts of stagnant acidic pit water was infiltrating into the groundwater table and contributing large sources of AMD to the Raccoon Creek watershed. The spoil was regraded with an alkaline addition during backfill.
The acidic overburden was also "capped" with a clay liner to prevent water infiltration and further groundwater degradation. The project has successfully lowered the acidity and metal concentration in the West Branch of Raccoon Creek.
Period of Performance: 2019-2020 The Western Pennsylvania Conservancy (WPC) installed a new passive treatment system to collect and treat two separate discharges along Cherry Run in Elk County, Pennsylvania. These discharges are coming from abandoned deep mine entries.
WPC worked with the PA Department of Environmental Protection Bureau of Abandoned Mine Reclamation (BAMR) to abate the discharges, with funding support from BAMR, OSMRE, Trout Unlimited, and a local fundraising campaign. BAMR also finished a project immediately adjacent to the WPC Cherry Run Treatment System project during the same time frame.
When fully complete, these projects will have the potential to completely restore Cherry Run and to help restore the larger watershed of the Bennet Branch of the Sinnemahoning. This project was originally funded by OSMRE in 2015, WPC required additional funds to complete the project and an amendment to the WCAP was awarded in 2019. The work was completed in the summer of 2020.
With the completion of the project, it is anticipated that seven miles of stream will be restored to wild trout fishery. Period of Performance: 2020 The Beaver Creek at Auman Road Passive AMD Treatment Project is located in a headwater tributary to Beaver Creek of the Big Sandy Creek of the Cheat River in Preston County, West Virginia.
This $131,025 WCAP was awarded to the non-profit watershed organization, Friends of the Cheat (FOC), in 2019 to design and construct a passive treatment system to remediate the last untreated sources of AMD impacting Beaver Creek. Beaver Creek has been the subject of a number of AMD remediation projects in the past.
These prior projects have contributed to the recovery of local aquatic life such that Beaver Creek contains fish and other aquatic species. Through this WCAP and additional partner funding, FOC designed and constructed two limestone leach beds, two settling ponds, and a wetland to neutralize the pH of the discharges and remove excess iron, aluminum, and manganese.
Construction of this system was completed in 2020 through the funding provided by OSMRE WCAP and West Virginia Department of Environmental Protection's Watershed Improvement Branch through the Clean Water Act Section 319 program, as well as in-kind services provided by FOC.
This treatment system aimed to reduce the acidity and metal load contributed by these AMD discharges by 80% and has exceeded this goal for acidity and aluminum, with a similar iron reduction predicted as the wetland plants become fully established.
According to the current listing, eligibility includes: Must be a 501(c)(3) tax-exempt nonprofit organization; project sites must comply with SMCRA Section 404 eligibility. Confirm the full requirements in the official notice before applying.
The current listing shows up to $100,000 per project. Verify award ceilings, matching requirements, and allowable costs in the official notice.
Watershed Cooperative Agreement Program (WCAP) is funded by Office of Surface Mining Reclamation and Enforcement (OSMRE). Verify program details on the funder's official page before applying.
Yes — this listing is flagged as national in scope, so applicants across the U.S. may apply, subject to the sponsor's other eligibility criteria.
Applications go through the funder's official portal — the Apply Now link on this page goes there directly.
Five weeks after a federal judge vacated the FY2026 Continuum of Care NOFO in its entirety, HUD published a Notice of Research Justifying Additional Incentives for Certain Activities To Reduce Homelessness. It is not a NOFO and not a proposed rule — it is the administrative record HUD needs to reissue the same policy and survive the next lawsuit. Here is what the four named activities tell you about the revised competition, why the October 13 comment deadline is now the real leverage point, and what CoC leads should be building right now.
Read articleHouse leadership canceled the September 21 and September 28 session weeks on September 3, leaving four legislative days before members leave until after the November 3 midterms. Three separate deadlines — the continuing resolution, the surface transportation extension, and the statutory freeze on OMB's grant-rule rewrite — now expire on the same day, with a lame-duck Congress and a handful of weeks to resolve them. Here is what that means for anyone holding or chasing a federal award.
Read articleWaterSMART's Cooperative Watershed Management Program (R26AS00349) opens its first of four rounds October 7, 2026: $25M, roughly 100 awards, $50,000 to $300,000 each, zero cost share. The catch is structural — the implementation program that funds the projects you plan closed September 9 and will not reopen until 2027.
Read article