1,000+ Opportunities
Find the right grant
Search federal, foundation, and corporate grants with AI — or browse by agency, topic, and state.
This listing may be outdated. Verify details at the official source before applying.
Find similar grantsThe WCECF awards grants twice a year to nonprofit organizations within Wood County Electric Cooperative's 9-county service territory. Funding supports various causes including food banks, lifesaving equipment, and other community needs.
Get a weekly digest of new grants like this
A free weekly digest of new foundation and federal funding opportunities as they're added to Granted. Unsubscribe anytime.
Or search similar grants →According to the current listing, eligibility includes: Nonprofit organizations within the 9-county service territory served by Wood County Electric Cooperative. Confirm the full requirements in the official notice before applying.
The current listing shows varies (recent awards up to $25,000). Verify award ceilings, matching requirements, and allowable costs in the official notice.
Wood County Electric Charitable Foundation (WCECF) Grants is funded by Wood County Electric Charitable Foundation. Verify program details on the funder's official page before applying.
Past winners and funding trends for this program
The RUS Powering Affordable Reliable Technology (PART) Energy Program takes Letters of Interest until October 9, 2026. Up to 40% of each loan can be forgiven, awards run $1M to $100M, and USDA describes eligible generation as hydro, geothermal, and biomass — even though Section 317 of the RE Act names solar and wind.
Read articleThe Rural Utilities Service published the ARC Program on September 14, 2026. Same IRA Section 22004 authority that carried the $9.7 billion New ERA program, redirected to nuclear power supply and transmission efficiency. Letters of Interest open October 19 and close November 20.
Read articleRelease 6's SBIR topics got the attention. Its three STTR topics — SHIELDER, fuel-flexible electric propulsion, and hypersonic wind tunnel noise diagnostics — are all Direct-to-Phase-II, all require a research institution to perform at least 30 percent of the work, and all close October 21, 2026. The feasibility gates are the real filter.
Read article